Cargando…
Run 1265 - 5th May 1982 - Rings 1 and 2 - 15 GeV/c, Correction of the FP and TW Lines
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1982
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131752 |
Ejemplares similares
-
Calibration of Luminosity Bumps at 15 GeV/c in Ring 2, Intersection 2, Run 1265, 15 GeV/c, FP Ring 2
por: Potter, K
Publicado: (1982) -
Runs 1193 and 1194 - 8th May 1981, Rings 1 and 2 - 11 GeV/c, FP and TW Working Lines at 11 GeV/c
por: Bryant, P J, et al.
Publicado: (1981) -
The momentum cooling system, Run 1265 - 8 May 1982, Run 1276 - 15 June 1982, Run 1278F - 21 June 1982 to 5 July 1982, Run 1280 - 8 July 1982, Run 1284 - 15 July 1982
por: Peschardt, E, et al.
Publicado: (1982) -
Run 1180 - Ring 1 - 27th March 1981, Run 1193 - Ring 1 - 7th May 1981, Run 1196 - Ring 2 - 14/15th May 1981, Acceleration from 26 to 31 GeV/c on FP
por: Bryant, P J, et al.
Publicado: (1981) -
Run 517 15 GeV FP line both Rings 5.9.74: Vertical Bumps at 15 GeV
por: Potter, K M
Publicado: (1974)