Cargando…
Run 1290 - 9th September 1982, Rings 1 and 2 - 26 - 31 GeV/c, Compensation of Fringe Field Using Correction Windings on the New DL Machine
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1982
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131760 |
Ejemplares similares
-
Run 1290 - 9th September 1982, Ring 1 - 26.558 GeV/c, Closed Orbits in Ring 1
por: Bryant, P J
Publicado: (1982) -
Run 1290 - Rings 1 and 2 - 26 GeV - 8 September 1982, Set-up, stacking and beam observation with the new DL sheme
por: Poole, J, et al.
Publicado: (1982) -
Run 1260 - 26th April 1982, Rings 1 and 2 - 26-31 GeV/c, Horizontal Orbit Distortion due to the Fringe Field on the DL machine
por: Bryant, P J
Publicado: (1982) -
Run 1276 - Rings 1 and 2 - 16th June 1982, Preparation of the DL Machine for Antiprotons
por: Bryant, P J
Publicado: (1982) -
Run 1315 - Rings 1 and 2 - 2nd December 1982, Preparation of the Re-Matched DL Machine for Antiprotons
por: Bryant, P J
Publicado: (1983)