Cargando…
Run 1290 - Rings 1 and 2 - 26 GeV - 8 September 1982, Set-up, stacking and beam observation with the new DL sheme
Autores principales: | Poole, J, Risselada, Thys, Verdier, A |
---|---|
Lenguaje: | eng |
Publicado: |
1982
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131762 |
Ejemplares similares
-
Run 1260 and 1264 - Rings 1 & 2 - 26 GeV, Stacking in both rings and physics test for the DL machine
por: Risselada, Thys, et al.
Publicado: (1982) -
Run 1246 - Rings 1 & 2 - 26 GeV - 2 March 1982, Preparation of the double low-B scheme for physics at 26 GeV
por: Risselada, Thys, et al.
Publicado: (1982) -
Run 1290 - 9th September 1982, Ring 1 - 26.558 GeV/c, Closed Orbits in Ring 1
por: Bryant, P J
Publicado: (1982) -
Run 1290 - 9th September 1982, Rings 1 and 2 - 26 - 31 GeV/c, Compensation of Fringe Field Using Correction Windings on the New DL Machine
por: Bryant, P J
Publicado: (1982) -
Run 1196 - Ring 1 and Ring 2 - 26-31 GeV/c, Acceleration files for the SL insertion
por: Risselada, Thys, et al.
Publicado: (1981)