Cargando…

Intensity Upgrade Plans for CERN-LHC Injectors

With LHC coming into operation very soon an upgrade plan for the whole CERN accelerator complex has been proposed to allow full exploitation of the LHC potential in the future as well as giving increased support to traditional and possible new experiments at lower beam energies. This plan foresees r...

Descripción completa

Detalles Bibliográficos
Autor principal: Shaposhnikova, Elena
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1132808
_version_ 1780915365896781824
author Shaposhnikova, Elena
author_facet Shaposhnikova, Elena
author_sort Shaposhnikova, Elena
collection CERN
description With LHC coming into operation very soon an upgrade plan for the whole CERN accelerator complex has been proposed to allow full exploitation of the LHC potential in the future as well as giving increased support to traditional and possible new experiments at lower beam energies. This plan foresees replacing during the period 2011 - 2017 all the accelerators in the LHC injector chain (Linac2,Booster, PS) by new machines (Linac4, SPL and PS2) except for the last - the SPS. In this scenario the SPS should be able to reliably accelerate twice higher beam intensity than achieved so far and therefore significant improvements to the machine performance, in addition to the increased injection energy due to PS2, should be found and implemented at the same time scale. The present status of proposals and ongoing studies for all accelerator injector chain is described with main emphasis on the SPS challenges and upgrade plans.
id cern-1132808
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11328082019-09-30T06:29:59Zhttp://cds.cern.ch/record/1132808engShaposhnikova, ElenaIntensity Upgrade Plans for CERN-LHC InjectorsAccelerators and Storage RingsWith LHC coming into operation very soon an upgrade plan for the whole CERN accelerator complex has been proposed to allow full exploitation of the LHC potential in the future as well as giving increased support to traditional and possible new experiments at lower beam energies. This plan foresees replacing during the period 2011 - 2017 all the accelerators in the LHC injector chain (Linac2,Booster, PS) by new machines (Linac4, SPL and PS2) except for the last - the SPS. In this scenario the SPS should be able to reliably accelerate twice higher beam intensity than achieved so far and therefore significant improvements to the machine performance, in addition to the increased injection energy due to PS2, should be found and implemented at the same time scale. The present status of proposals and ongoing studies for all accelerator injector chain is described with main emphasis on the SPS challenges and upgrade plans.CERN-AB-2008-065oai:cds.cern.ch:11328082008-08-25
spellingShingle Accelerators and Storage Rings
Shaposhnikova, Elena
Intensity Upgrade Plans for CERN-LHC Injectors
title Intensity Upgrade Plans for CERN-LHC Injectors
title_full Intensity Upgrade Plans for CERN-LHC Injectors
title_fullStr Intensity Upgrade Plans for CERN-LHC Injectors
title_full_unstemmed Intensity Upgrade Plans for CERN-LHC Injectors
title_short Intensity Upgrade Plans for CERN-LHC Injectors
title_sort intensity upgrade plans for cern-lhc injectors
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1132808
work_keys_str_mv AT shaposhnikovaelena intensityupgradeplansforcernlhcinjectors