Cargando…

Turnaround time in modern hadron colliders & store-length optimization

The paper presents a review of the average accelerator turnaround time in existing superconducting hadron machines (HERA at DESY@, RHIC at BNL§ and the TEVATRON at FNAL&). Based on the past experience with these previous hadron accelerators the paper aims at a best guess estimate for an initial...

Descripción completa

Detalles Bibliográficos
Autor principal: Brüning, Oliver Sim
Lenguaje:eng
Publicado: CERN 2008
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2008-005.34
http://cds.cern.ch/record/1133125
Descripción
Sumario:The paper presents a review of the average accelerator turnaround time in existing superconducting hadron machines (HERA at DESY@, RHIC at BNL§ and the TEVATRON at FNAL&). Based on the past experience with these previous hadron accelerators the paper aims at a best guess estimate for an initial and optimum turnaround time in the LHC during the first year of operation and for routine operation after the machine commissioning.