Cargando…
TT detector description and implementation of the survey measurements
The TT geometry in the software has been updated to comply with the latest technical drawings. The main difference is in the description of the beam pipe insulation, where the amount of material has increased from $7.5\%$ to $15.4\%$ of $X_0$. Mother volumes are added to decrease the CPU consumption...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1140703 |
_version_ | 1780915539758022656 |
---|---|
author | Salzmann, C Van Tilburg, J |
author_facet | Salzmann, C Van Tilburg, J |
author_sort | Salzmann, C |
collection | CERN |
description | The TT geometry in the software has been updated to comply with the latest technical drawings. The main difference is in the description of the beam pipe insulation, where the amount of material has increased from $7.5\%$ to $15.4\%$ of $X_0$. Mother volumes are added to decrease the CPU consumption and finally several scans are made to compare the material budget between the DC06 geometry and the new 2008 geometry. In addition, the survey measurements of the TT detector have been analysed. These measurements can be subdivided into surveys of the detector box, photogrammetry of the balconies and metrology of the half-modules. The offsets with the nominal geometry are implemented in the alignment condition database. |
id | cern-1140703 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11407032019-09-30T06:29:59Zhttp://cds.cern.ch/record/1140703engSalzmann, CVan Tilburg, JTT detector description and implementation of the survey measurementsPhysics in GeneralThe TT geometry in the software has been updated to comply with the latest technical drawings. The main difference is in the description of the beam pipe insulation, where the amount of material has increased from $7.5\%$ to $15.4\%$ of $X_0$. Mother volumes are added to decrease the CPU consumption and finally several scans are made to compare the material budget between the DC06 geometry and the new 2008 geometry. In addition, the survey measurements of the TT detector have been analysed. These measurements can be subdivided into surveys of the detector box, photogrammetry of the balconies and metrology of the half-modules. The offsets with the nominal geometry are implemented in the alignment condition database.LHCb-2008-061CERN-LHCb-2008-061oai:cds.cern.ch:11407032008-11-19 |
spellingShingle | Physics in General Salzmann, C Van Tilburg, J TT detector description and implementation of the survey measurements |
title | TT detector description and implementation of the survey measurements |
title_full | TT detector description and implementation of the survey measurements |
title_fullStr | TT detector description and implementation of the survey measurements |
title_full_unstemmed | TT detector description and implementation of the survey measurements |
title_short | TT detector description and implementation of the survey measurements |
title_sort | tt detector description and implementation of the survey measurements |
topic | Physics in General |
url | http://cds.cern.ch/record/1140703 |
work_keys_str_mv | AT salzmannc ttdetectordescriptionandimplementationofthesurveymeasurements AT vantilburgj ttdetectordescriptionandimplementationofthesurveymeasurements |