E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation

The new ST-HM contract E072 for the maintenance of transport and handling equipment is designed to obtain the high operating reliability as required for the LHC installation and to respect the situation of limited resources at CERN at the same time. The contract is based on a dynamic maintenance str...

Descripción completa

Detalles Bibliográficos
Autor principal: Böttcher, O
Lenguaje:eng
Publicado: 2003
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/1140757
_version_ 1780915548624781312
author Böttcher, O
author_facet Böttcher, O
author_sort Böttcher, O
collection CERN
description The new ST-HM contract E072 for the maintenance of transport and handling equipment is designed to obtain the high operating reliability as required for the LHC installation and to respect the situation of limited resources at CERN at the same time. The contract is based on a dynamic maintenance strategy. It contains a flexible maintenance contingent that is essential to prepare the equipment for extremely important and critical utilization phases that will come up during the LHC installation. Due to very little utilisation and non-strategic importance of approximately 80% of the whole inventory the preventive maintenance service will be reduced to a minimum. In order to convert this strategy into practice it is necessary to establish well-defined interfaces between the users that realise the project schedules and the maintenance service.
id cern-1140757
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-11407572019-09-30T06:29:59Zhttp://cds.cern.ch/record/1140757engBöttcher, OE072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installationXXThe new ST-HM contract E072 for the maintenance of transport and handling equipment is designed to obtain the high operating reliability as required for the LHC installation and to respect the situation of limited resources at CERN at the same time. The contract is based on a dynamic maintenance strategy. It contains a flexible maintenance contingent that is essential to prepare the equipment for extremely important and critical utilization phases that will come up during the LHC installation. Due to very little utilisation and non-strategic importance of approximately 80% of the whole inventory the preventive maintenance service will be reduced to a minimum. In order to convert this strategy into practice it is necessary to establish well-defined interfaces between the users that realise the project schedules and the maintenance service.ST-Note-2003-013oai:cds.cern.ch:11407572003
spellingShingle XX
Böttcher, O
E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title_full E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title_fullStr E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title_full_unstemmed E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title_short E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
title_sort e072/st-hm - a dynamic maintenance strategie to meet the requirements of the lhc installation
topic XX
url http://cds.cern.ch/record/1140757
work_keys_str_mv AT bottchero e072sthmadynamicmaintenancestrategietomeettherequirementsofthelhcinstallation