Cargando…

Retendering of ST-CV maintenance contract

During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the...

Descripción completa

Detalles Bibliográficos
Autor principal: Battistin, M
Lenguaje:eng
Publicado: 2003
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/1140779
Descripción
Sumario:During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the CV group to undergo a reorganisation during 2002 and is going to force deep changes in its work organisation.