Cargando…

ST-HM design section: Strategy and working methods

The design section of the ST-HM group is devoted to realise all studies for new transport and handling equipment to be procured and installed according to the needs of CERN. In year 2002, the design section has gradually passed from strong engagement in few huge projects to a multitude of ‘less expe...

Descripción completa

Detalles Bibliográficos
Autor principal: Bertone, C
Lenguaje:eng
Publicado: 2003
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/1140790
_version_ 1780915555128049664
author Bertone, C
author_facet Bertone, C
author_sort Bertone, C
collection CERN
description The design section of the ST-HM group is devoted to realise all studies for new transport and handling equipment to be procured and installed according to the needs of CERN. In year 2002, the design section has gradually passed from strong engagement in few huge projects to a multitude of ‘less expensive’ projects that require a fast solution and procurement for the LHC installation. The future tasks of our section will be feasibility studies of transport and handling manoeuvres as required for the installation of LHC components and the calculation of lifting tools. In addition the procurement of not yet defined items to solve problems that will occur during the LHC installation. This document gives an overview of the organisation of the design section, the projects and will also underline some problems, such as the incompatibility between the urgency of the users and long CERN purchasing procedures, the work overload, the increasing design requirements for handling tools and operations that were originally not foreseen.
id cern-1140790
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-11407902019-09-30T06:29:59Zhttp://cds.cern.ch/record/1140790engBertone, CST-HM design section: Strategy and working methodsXXThe design section of the ST-HM group is devoted to realise all studies for new transport and handling equipment to be procured and installed according to the needs of CERN. In year 2002, the design section has gradually passed from strong engagement in few huge projects to a multitude of ‘less expensive’ projects that require a fast solution and procurement for the LHC installation. The future tasks of our section will be feasibility studies of transport and handling manoeuvres as required for the installation of LHC components and the calculation of lifting tools. In addition the procurement of not yet defined items to solve problems that will occur during the LHC installation. This document gives an overview of the organisation of the design section, the projects and will also underline some problems, such as the incompatibility between the urgency of the users and long CERN purchasing procedures, the work overload, the increasing design requirements for handling tools and operations that were originally not foreseen.ST-Note-2003-043oai:cds.cern.ch:11407902003
spellingShingle XX
Bertone, C
ST-HM design section: Strategy and working methods
title ST-HM design section: Strategy and working methods
title_full ST-HM design section: Strategy and working methods
title_fullStr ST-HM design section: Strategy and working methods
title_full_unstemmed ST-HM design section: Strategy and working methods
title_short ST-HM design section: Strategy and working methods
title_sort st-hm design section: strategy and working methods
topic XX
url http://cds.cern.ch/record/1140790
work_keys_str_mv AT bertonec sthmdesignsectionstrategyandworkingmethods