Cargando…
LHC Transverse Feedback System: First Results of Commissionning
A powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise the high intensity beam against coupled bunch transverse instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors a...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1141925 |
_version_ | 1780915596894928896 |
---|---|
author | Zhabitsky, V M Gorbachev, E V Lebedev, N I Makarov, A A Pilyar, N V Rabtsun, S V Smolkov, R A Baudrenghien, P Höfle, Wolfgang Killing, F Kojevnikov, I Kotzian, G Louwerse, R Montesinos, E Rossi, V Schokker, M Thepenier, E Valuch, D |
author_facet | Zhabitsky, V M Gorbachev, E V Lebedev, N I Makarov, A A Pilyar, N V Rabtsun, S V Smolkov, R A Baudrenghien, P Höfle, Wolfgang Killing, F Kojevnikov, I Kotzian, G Louwerse, R Montesinos, E Rossi, V Schokker, M Thepenier, E Valuch, D |
author_sort | Zhabitsky, V M |
collection | CERN |
description | A powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise the high intensity beam against coupled bunch transverse instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors and injection kicker ripple. The LHC Damper can also be used as means of exciting transverse oscillations for the purposes of abort gap cleaning and tune measurement. The LHC Damper includes 4 feedback systems on 2 circulating beams (in other words one feedback system per beam and plane). Every feedback system consists of 4 electrostatic kickers, 4 push-pull wide band power amplifiers, 8 preamplifiers, two digital processing units and 2 beam position monitors with low-level electronics. The power and low-level subsystem layout is described along with first results from the commissioning of 16 power amplifiers and 16 electrostatic kickers located in the LHC tunnel. The achieved performance is compared with earlier predictions and requirements for injection damping and instability control. Requirements and first measurements of the performance of the power and low-level subsystems are summarized. |
id | cern-1141925 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11419252023-05-31T13:23:04Zhttp://cds.cern.ch/record/1141925engZhabitsky, V MGorbachev, E VLebedev, N IMakarov, A APilyar, N VRabtsun, S VSmolkov, R ABaudrenghien, PHöfle, WolfgangKilling, FKojevnikov, IKotzian, GLouwerse, RMontesinos, ERossi, VSchokker, MThepenier, EValuch, DLHC Transverse Feedback System: First Results of CommissionningAccelerators and Storage RingsA powerful transverse feedback system ("Damper") has been installed in LHC. It will stabilise the high intensity beam against coupled bunch transverse instabilities in a frequency range from 3 kHz to 20 MHz and at the same time damp injection oscillations originating from steering errors and injection kicker ripple. The LHC Damper can also be used as means of exciting transverse oscillations for the purposes of abort gap cleaning and tune measurement. The LHC Damper includes 4 feedback systems on 2 circulating beams (in other words one feedback system per beam and plane). Every feedback system consists of 4 electrostatic kickers, 4 push-pull wide band power amplifiers, 8 preamplifiers, two digital processing units and 2 beam position monitors with low-level electronics. The power and low-level subsystem layout is described along with first results from the commissioning of 16 power amplifiers and 16 electrostatic kickers located in the LHC tunnel. The achieved performance is compared with earlier predictions and requirements for injection damping and instability control. Requirements and first measurements of the performance of the power and low-level subsystems are summarized.LHC-PROJECT-Report-1165CERN-LHC-PROJECT-Report-1165oai:cds.cern.ch:11419252008-09-28 |
spellingShingle | Accelerators and Storage Rings Zhabitsky, V M Gorbachev, E V Lebedev, N I Makarov, A A Pilyar, N V Rabtsun, S V Smolkov, R A Baudrenghien, P Höfle, Wolfgang Killing, F Kojevnikov, I Kotzian, G Louwerse, R Montesinos, E Rossi, V Schokker, M Thepenier, E Valuch, D LHC Transverse Feedback System: First Results of Commissionning |
title | LHC Transverse Feedback System: First Results of Commissionning |
title_full | LHC Transverse Feedback System: First Results of Commissionning |
title_fullStr | LHC Transverse Feedback System: First Results of Commissionning |
title_full_unstemmed | LHC Transverse Feedback System: First Results of Commissionning |
title_short | LHC Transverse Feedback System: First Results of Commissionning |
title_sort | lhc transverse feedback system: first results of commissionning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1141925 |
work_keys_str_mv | AT zhabitskyvm lhctransversefeedbacksystemfirstresultsofcommissionning AT gorbachevev lhctransversefeedbacksystemfirstresultsofcommissionning AT lebedevni lhctransversefeedbacksystemfirstresultsofcommissionning AT makarovaa lhctransversefeedbacksystemfirstresultsofcommissionning AT pilyarnv lhctransversefeedbacksystemfirstresultsofcommissionning AT rabtsunsv lhctransversefeedbacksystemfirstresultsofcommissionning AT smolkovra lhctransversefeedbacksystemfirstresultsofcommissionning AT baudrenghienp lhctransversefeedbacksystemfirstresultsofcommissionning AT hoflewolfgang lhctransversefeedbacksystemfirstresultsofcommissionning AT killingf lhctransversefeedbacksystemfirstresultsofcommissionning AT kojevnikovi lhctransversefeedbacksystemfirstresultsofcommissionning AT kotziang lhctransversefeedbacksystemfirstresultsofcommissionning AT louwerser lhctransversefeedbacksystemfirstresultsofcommissionning AT montesinose lhctransversefeedbacksystemfirstresultsofcommissionning AT rossiv lhctransversefeedbacksystemfirstresultsofcommissionning AT schokkerm lhctransversefeedbacksystemfirstresultsofcommissionning AT thepeniere lhctransversefeedbacksystemfirstresultsofcommissionning AT valuchd lhctransversefeedbacksystemfirstresultsofcommissionning |