Commissioning of the SCT
In September 2008, the Large Hadron Collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS SemiConductor Tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS sub-detec...
Autor principal: | Hayward, H |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1142148 |
Ejemplares similares
-
ATLAS SCT Commissioning – TWEPP-08
por: Magrath, C A
Publicado: (2008) -
The ATLAS SCT: Commissioning Experience and SLHC Upgrade
por: Mitrevski, J
Publicado: (2008) -
Redundancy and Synchronisation in the SCT
por: Nickerson, R B, et al.
Publicado: (1996) -
Redundancy and Synchronisation in the SCT
por: Nickerson, R B, et al.
Publicado: (1996) -
Status of the ATLAS SCT
por: Clark, Allan, et al.
Publicado: (2007)