Short Circuit Tests: First Step of LHC Hardware Commissioning Completion

For the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power conv...

Descripción completa

Detalles Bibliográficos
Autores principales: Barbero-Soto, E, Bellesia, B, Bordry, Frederick, Casas Lino, M P, Coelingh, G J, Cumer, G, Dahlerup-Petersen, K, Guillaume, J C, Inigo-Golfin, J, Montabonnet, V, Nisbet, D, Pojer, M, Principe, R, Rodríguez-Mateos, F, Saban, R, Schmidt, R, Thiesen, H, Vergara-Fernández, A, Zerlauth, M, Castaneda Serra, A, Romera Ramirez, I
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1151303
_version_ 1780915661564805120
author Barbero-Soto, E
Bellesia, B
Bordry, Frederick
Casas Lino, M P
Coelingh, G J
Cumer, G
Dahlerup-Petersen, K
Guillaume, J C
Inigo-Golfin, J
Montabonnet, V
Nisbet, D
Pojer, M
Principe, R
Rodríguez-Mateos, F
Saban, R
Schmidt, R
Thiesen, H
Vergara-Fernández, A
Zerlauth, M
Castaneda Serra, A
Romera Ramirez, I
author_facet Barbero-Soto, E
Bellesia, B
Bordry, Frederick
Casas Lino, M P
Coelingh, G J
Cumer, G
Dahlerup-Petersen, K
Guillaume, J C
Inigo-Golfin, J
Montabonnet, V
Nisbet, D
Pojer, M
Principe, R
Rodríguez-Mateos, F
Saban, R
Schmidt, R
Thiesen, H
Vergara-Fernández, A
Zerlauth, M
Castaneda Serra, A
Romera Ramirez, I
author_sort Barbero-Soto, E
collection CERN
description For the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power converters that have been designed for the LHC with a current between 60 and 13000A. Between October 2005 and September 2007 the so-called Short Circuit Tests were carried-out in 15 underground zones where the power converters of the superconducting circuits are placed. The tests aimed to qualify the normal conducting equipments of the circuits such as power converters and normal conducting high current cables. The correct operation of interlock and energy extraction systems was validated. The infrastructure systems including AC distribution, water and air cooling and the control systems was also commissioned. In this paper the results of the two year test campaign are summarized with particular attention to problems encountered and how they were solved.
id cern-1151303
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11513032022-08-17T13:34:22Zhttp://cds.cern.ch/record/1151303engBarbero-Soto, EBellesia, BBordry, FrederickCasas Lino, M PCoelingh, G JCumer, GDahlerup-Petersen, KGuillaume, J CInigo-Golfin, JMontabonnet, VNisbet, DPojer, MPrincipe, RRodríguez-Mateos, FSaban, RSchmidt, RThiesen, HVergara-Fernández, AZerlauth, MCastaneda Serra, ARomera Ramirez, IShort Circuit Tests: First Step of LHC Hardware Commissioning CompletionEngineeringFor the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power converters that have been designed for the LHC with a current between 60 and 13000A. Between October 2005 and September 2007 the so-called Short Circuit Tests were carried-out in 15 underground zones where the power converters of the superconducting circuits are placed. The tests aimed to qualify the normal conducting equipments of the circuits such as power converters and normal conducting high current cables. The correct operation of interlock and energy extraction systems was validated. The infrastructure systems including AC distribution, water and air cooling and the control systems was also commissioned. In this paper the results of the two year test campaign are summarized with particular attention to problems encountered and how they were solved.CERN-TS-2008-003oai:cds.cern.ch:11513032008-06-22
spellingShingle Engineering
Barbero-Soto, E
Bellesia, B
Bordry, Frederick
Casas Lino, M P
Coelingh, G J
Cumer, G
Dahlerup-Petersen, K
Guillaume, J C
Inigo-Golfin, J
Montabonnet, V
Nisbet, D
Pojer, M
Principe, R
Rodríguez-Mateos, F
Saban, R
Schmidt, R
Thiesen, H
Vergara-Fernández, A
Zerlauth, M
Castaneda Serra, A
Romera Ramirez, I
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title_full Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title_fullStr Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title_full_unstemmed Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title_short Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
title_sort short circuit tests: first step of lhc hardware commissioning completion
topic Engineering
url http://cds.cern.ch/record/1151303
work_keys_str_mv AT barberosotoe shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT bellesiab shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT bordryfrederick shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT casaslinomp shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT coelinghgj shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT cumerg shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT dahleruppetersenk shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT guillaumejc shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT inigogolfinj shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT montabonnetv shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT nisbetd shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT pojerm shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT principer shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT rodriguezmateosf shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT sabanr shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT schmidtr shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT thiesenh shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT vergarafernandeza shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT zerlauthm shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT castanedaserraa shortcircuittestsfirststepoflhchardwarecommissioningcompletion
AT romeraramirezi shortcircuittestsfirststepoflhchardwarecommissioningcompletion