Cargando…
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
For the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power conv...
Autores principales: | Barbero-Soto, E, Bellesia, B, Bordry, Frederick, Casas Lino, M P, Coelingh, G J, Cumer, G, Dahlerup-Petersen, K, Guillaume, J C, Inigo-Golfin, J, Montabonnet, V, Nisbet, D, Pojer, M, Principe, R, Rodríguez-Mateos, F, Saban, R, Schmidt, R, Thiesen, H, Vergara-Fernández, A, Zerlauth, M, Castaneda Serra, A, Romera Ramirez, I |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1151303 |
Ejemplares similares
-
Information Management within the LHC Hardware Commissioning Project
por: Bellesia, B, et al.
Publicado: (2009) -
The Commissioning of the LHC Technical Systems
por: Saban, R, et al.
Publicado: (2007) -
Coordination of the commissioning of the LHC technical systems
por: Saban, R, et al.
Publicado: (2008) -
Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
por: Verweij, A, et al.
Publicado: (2008) -
Hardware commissioning
por: Saban, R
Publicado: (2005)