Cargando…
Coordination of the commissioning of the LHC technical systems
The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and 400 superconducting quadrupoles with a strength of 220 T/m powered at 12kA, operating in superfluid He at 1.9K. For dipoles and quadrupoles as well as for many other magnets more than 1700 power conv...
Autores principales: | Saban, R, Bellesia, B, Casas Lino, M P, Fernandez Robles, C, Pojer, M, Schmidt, R, Solfaroli Camillocci, M, Vergara Fernandez, A |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1151309 |
Ejemplares similares
-
Optimization of the powering tests of the LHC superconducting circuits
por: Bellesia, B, et al.
Publicado: (2009) -
Information Management within the LHC Hardware Commissioning Project
por: Bellesia, B, et al.
Publicado: (2009) -
The Commissioning of the LHC Technical Systems
por: Saban, R, et al.
Publicado: (2007) -
Magnet Circuits
por: Vergara Fernandez, A, et al.
Publicado: (2009) -
Commissioning of the LHC Magnet Powering System in 2009
por: Solfaroli Camillocci, Matteo, et al.
Publicado: (2010)