Scheduling the powering tests

The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this mac...

Descripción completa

Detalles Bibliográficos
Autores principales: Barbero-Soto, E, Bellesia, B, Casas-Lino, M P, Fernandez-Robles, C, Foraz, K, Pojer, M, Saban, R, Schmidt, R, Solfaroli-Camillocci, M, Vergara-Fernandez, A
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1151315
_version_ 1780915663947169792
author Barbero-Soto, E
Bellesia, B
Casas-Lino, M P
Fernandez-Robles, C
Foraz, K
Pojer, M
Saban, R
Schmidt, R
Solfaroli-Camillocci, M
Vergara-Fernandez, A
author_facet Barbero-Soto, E
Bellesia, B
Casas-Lino, M P
Fernandez-Robles, C
Foraz, K
Pojer, M
Saban, R
Schmidt, R
Solfaroli-Camillocci, M
Vergara-Fernandez, A
author_sort Barbero-Soto, E
collection CERN
description The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.
id cern-1151315
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11513152022-08-17T13:34:24Zhttp://cds.cern.ch/record/1151315engBarbero-Soto, EBellesia, BCasas-Lino, M PFernandez-Robles, CForaz, KPojer, MSaban, RSchmidt, RSolfaroli-Camillocci, MVergara-Fernandez, AScheduling the powering testsEngineeringThe Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.CERN-TS-2008-014oai:cds.cern.ch:11513152008-06-22
spellingShingle Engineering
Barbero-Soto, E
Bellesia, B
Casas-Lino, M P
Fernandez-Robles, C
Foraz, K
Pojer, M
Saban, R
Schmidt, R
Solfaroli-Camillocci, M
Vergara-Fernandez, A
Scheduling the powering tests
title Scheduling the powering tests
title_full Scheduling the powering tests
title_fullStr Scheduling the powering tests
title_full_unstemmed Scheduling the powering tests
title_short Scheduling the powering tests
title_sort scheduling the powering tests
topic Engineering
url http://cds.cern.ch/record/1151315
work_keys_str_mv AT barberosotoe schedulingthepoweringtests
AT bellesiab schedulingthepoweringtests
AT casaslinomp schedulingthepoweringtests
AT fernandezroblesc schedulingthepoweringtests
AT forazk schedulingthepoweringtests
AT pojerm schedulingthepoweringtests
AT sabanr schedulingthepoweringtests
AT schmidtr schedulingthepoweringtests
AT solfarolicamilloccim schedulingthepoweringtests
AT vergarafernandeza schedulingthepoweringtests