Scheduling the powering tests
The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this mac...
Autores principales: | Barbero-Soto, E, Bellesia, B, Casas-Lino, M P, Fernandez-Robles, C, Foraz, K, Pojer, M, Saban, R, Schmidt, R, Solfaroli-Camillocci, M, Vergara-Fernandez, A |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1151315 |
Ejemplares similares
-
Optimization of the powering tests of the LHC superconducting circuits
por: Bellesia, B, et al.
Publicado: (2009) -
Coordination of the commissioning of the LHC technical systems
por: Saban, R, et al.
Publicado: (2008) -
Magnet Circuits
por: Vergara Fernandez, A, et al.
Publicado: (2009) -
Short Circuit Tests: First Step of LHC Hardware Commissioning Completion
por: Barbero-Soto, E, et al.
Publicado: (2008) -
Information Management within the LHC Hardware Commissioning Project
por: Bellesia, B, et al.
Publicado: (2009)