Cargando…
Timing and Fast Control and Readout Electronics Aspects of the LHCb Upgrade
LHCb is considering an upgrade towards a full 40 MHz readout [1], possibly in several stages implying that a rudimentary rate control will still be needed. The rate control could be achieved by either maintaining the current L0 trigger infrastructure since it is already operating at 40MHz, or implem...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1151987 |