CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification
The installation of 52304 optical links for the readout and control of the CMS Tracker, ECAL and Pixel detectors is complete. 768 96-way optical cables were installed and tested using an optical time-domain reflectometer. The testing was followed by connections at high density optical fibre patchpan...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2008
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2008-008.477 http://cds.cern.ch/record/1159554 |
_version_ | 1780915847418609664 |
---|---|
author | Ricci, D Amaral, L Dris, S Grill, K Jimenez Pacheco, A Palmonari, F Radicci, V Singovsky, A V Troska, J Vasey, F |
author_facet | Ricci, D Amaral, L Dris, S Grill, K Jimenez Pacheco, A Palmonari, F Radicci, V Singovsky, A V Troska, J Vasey, F |
author_sort | Ricci, D |
collection | CERN |
description | The installation of 52304 optical links for the readout and control of the CMS Tracker, ECAL and Pixel detectors is complete. 768 96-way optical cables were installed and tested using an optical time-domain reflectometer. The testing was followed by connections at high density optical fibre patchpanels. Finally, a further round of testing and troubleshooting following feedback from system commissioning with the Tracker Data Acquisition was carried out. Over 90% of the faults found were recovered, resulting overall in only 0.1% of dead optical link channels in the CMS Tracker. |
id | cern-1159554 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
publisher | CERN |
record_format | invenio |
spelling | cern-11595542019-09-30T06:29:59Zdoi:10.5170/CERN-2008-008.477http://cds.cern.ch/record/1159554engRicci, DAmaral, LDris, SGrill, KJimenez Pacheco, APalmonari, FRadicci, VSingovsky, A VTroska, JVasey, FCMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance VerificationDetectors and Experimental TechniquesThe installation of 52304 optical links for the readout and control of the CMS Tracker, ECAL and Pixel detectors is complete. 768 96-way optical cables were installed and tested using an optical time-domain reflectometer. The testing was followed by connections at high density optical fibre patchpanels. Finally, a further round of testing and troubleshooting following feedback from system commissioning with the Tracker Data Acquisition was carried out. Over 90% of the faults found were recovered, resulting overall in only 0.1% of dead optical link channels in the CMS Tracker.CERNoai:cds.cern.ch:11595542008 |
spellingShingle | Detectors and Experimental Techniques Ricci, D Amaral, L Dris, S Grill, K Jimenez Pacheco, A Palmonari, F Radicci, V Singovsky, A V Troska, J Vasey, F CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title | CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title_full | CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title_fullStr | CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title_full_unstemmed | CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title_short | CMS Tracker, ECAL and Pixel Optical Cabling: Installation and Performance Verification |
title_sort | cms tracker, ecal and pixel optical cabling: installation and performance verification |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.5170/CERN-2008-008.477 http://cds.cern.ch/record/1159554 |
work_keys_str_mv | AT riccid cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT amarall cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT driss cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT grillk cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT jimenezpachecoa cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT palmonarif cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT radicciv cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT singovskyav cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT troskaj cmstrackerecalandpixelopticalcablinginstallationandperformanceverification AT vaseyf cmstrackerecalandpixelopticalcablinginstallationandperformanceverification |