Cargando…
Summary of CARE-HHH Mini-Workshop on LHC Crab Cavity Validation, 21 August 2008
A global LHC crab-cavity collaboration is rapidly advancing the R&D of a complete crab cavity cryomodule and performing the associated beam dynamics simulations compatible with a prototype test in the phase 0/I upgrade with the aim of establishing a full crab crossing scheme for the phase II upg...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1159902 |
Sumario: | A global LHC crab-cavity collaboration is rapidly advancing the R&D of a complete crab cavity cryomodule and performing the associated beam dynamics simulations compatible with a prototype test in the phase 0/I upgrade with the aim of establishing a full crab crossing scheme for the phase II upgrade of the LHC. A one day CARE-HHH mini-workshop was held on August 21, 2008 at CERN to discuss crab crossing in the LHC phase 0/I & II upgrades and this reports summarizes the activities of the four sessions that took place during the workshop. The goals of this crab-cavity workshop were fourfold: (1) to discuss prospects of crab cavities in LHC upgrades (2) to review the status of the cryomodule development and beam dynamics, (3) to establish validity requirements for LHC crab cavities which need to be demonstrated prior to their installation into the LHC, and (4) to provide guidance & coordination for the global collaborators. |
---|