Cargando…
Magnets for the phase I LHC upgrade
The scope of the LHC Upgrade Phase I is to make possible the focusing of the beams to a β*=0.25 m in IP1 and IP5, and provide reliable operation of the LHC at a luminosity of 2 10^{34} cm^{-2} s^{-1}. Presently the time-line of the project foresees the installation of the equipment in the tunnel dur...
Autor principal: | Fessia, P |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2009
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2009-001.101 http://cds.cern.ch/record/1162825 |
Ejemplares similares
-
LHC Upgrade Phase I: Preliminary Study of the Collar Structure for the New Inner Triplet Quadrupole
por: Fessia, P, et al.
Publicado: (2009) -
Electromagnetic Design of the 120 mm Aperture Quadrupole for the LHC Phase One Upgrade
por: Borgnolutti, F, et al.
Publicado: (2009) -
Conceptual Design of the LHC Interaction Region Upgrade: Phase-I
por: Ostojic, R, et al.
Publicado: (2008) -
A 120 mm Bore Quadrupole for the Phase 1 LHC Upgrade
por: Fessia, P, et al.
Publicado: (2010) -
Heat Transfer in an Enhanced Cable Insulation Scheme for the Superconducting Magnets of the LHC Luminosity Upgrade
por: Granieri, P P, et al.
Publicado: (2010)