Cargando…

Magnets for the phase I LHC upgrade

The scope of the LHC Upgrade Phase I is to make possible the focusing of the beams to a β*=0.25 m in IP1 and IP5, and provide reliable operation of the LHC at a luminosity of 2 10^{34} cm^{-2} s^{-1}. Presently the time-line of the project foresees the installation of the equipment in the tunnel dur...

Descripción completa

Detalles Bibliográficos
Autor principal: Fessia, P
Lenguaje:eng
Publicado: CERN 2009
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2009-001.101
http://cds.cern.ch/record/1162825

Ejemplares similares