Cargando…
The construction and commissioning of the CMS Silicon Strip Tracker
As the start up date for LHC approaches, the detectors are readying for data taking. Here a review will be given on the construction phase with insights into the various difficulties encountered during the process. An overview will also be given of the commissioning strategy and results obtained so...
Autor principal: | Sguazzoni, Giacomo |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1166319 |
Ejemplares similares
-
Commissioning and Calibrating the CMS Silicon Strip Tracker
por: Bainbridge, Robert, et al.
Publicado: (2007) -
Status of the CMS Silicon Strip Tracker and Commissioning Results
por: Anghel, Ioana
Publicado: (2008) -
Studies for the Commissioning of the CERN CMS Silicon Strip Tracker
por: Bloch, Christoph
Publicado: (2008) -
CMS Silicon Strip Tracker Commissioning and Preliminary Performances
por: Palmonari, F M
Publicado: (2009) -
Construction of the CMS silicon strip tracker
por: Dirkes, G H
Publicado: (2007)