Cargando…
Evolution of beam losses after a power cut of the SR7 AC supply
Magnet failures in the LHC could lead to equipment damage if the energy stored in the accelerator was not discharged properly. The Machine Protection Systems (MPS) ensure this proper discharge and knowledge about the evolution of losses in case of failure is needed to evaluate the adequacy of the pr...
Autor principal: | GOMEZ ALONSO, A |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1171225 |
Ejemplares similares
-
Performance of Switched Mode AC Power Supply
por: Liu, C Y, et al.
Publicado: (2001) -
Technical specification for AC/DC switched mode power supply
Publicado: (1985) -
Extension of the 6 KV AC filter of the PS booster main power supply
por: Völker, F
Publicado: (1978) -
Extension of the 6 kV AC filter of the PS booster main power supply
por: Völker, F
Publicado: (1978) -
Specifications of power supplies for beam transport magnets
Publicado: (1959)