During the almost 18 months of hardware commissioning nearly all superconducting circuits of the LHC were tested with success and many of them are/were ready for operation. However a number of unexpected observations were made, which either may limit the performance of the accelerator, have an impac...
Autor principal: | Mess, K H |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172382 |
Ejemplares similares
-
Detection and location of electrical insulation faults on the LHC superconducting circuits during hardware commissioning
por: Bozzini, D, et al.
Publicado: (2008) -
Experience with the Quality Assurance of the Superconducting Electrical Circuits of the LHC Machine
por: Bozzini, D, et al.
Publicado: (2006) -
Electrical Quality Assurance of the Superconducting Circuits during LHC Machine Assembly
por: Bozzini, D, et al.
Publicado: (2008) -
Upgrade of the protection system for superconducting circuits in the LHC
por: Denz, R, et al.
Publicado: (2009) -
Automatic Analysis at the Commissioning of the LHC Superconducting Electrical Circuits
por: Reymond, H, et al.