Cargando…
Emergency preparedness
On September 19th 2008, a technical fault was at the centre of a sequence of events which hampered the performance of certain equipments of the LHC 3-4 sector. Once the first effects of this sequence of events were detected, the behaviour of the CERN staff confronted to this complex and critical sit...
Autores principales: | Cennini, E, Doebbeling, P, Oortman Gerlings, P |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172391 |
Ejemplares similares
-
The Data Acquisition System for the TOF Facility: Guidelines.
por: Cennini, P
Publicado: (1999) -
Injection line beam current transformer system for the PS booster
por: Cennini, P
Publicado: (1980) -
Proposal for a Fission Detector based on the measurement of the ionization produced by the absorption in gas of the Fission Fragments.
por: Cennini, P, et al.
Publicado: (2000) -
Access: Let them in but get them out on time !
por: Cennini, E
Publicado: (2001) -
Fission Fragment Detector to be installed at the Measuring Station in the TOF Facility.
por: Cennini, P, et al.
Publicado: (1999)