Cargando…

Other systems – what needs to be done?: Repair and reinstallation of other systems (standard QPS, PC, BLM, Cryo, Survey, …)

After the incident occurred on the 19th September all equipment and systems (such as QPS racks, PC, BLM, Cryo instrumentation control etc.) located in the tunnel, especially in the incident affected area, were removed from the tunnel in order to allow an easy damage inspection. After a change or rep...

Descripción completa

Detalles Bibliográficos
Autores principales: Solfaroli Camillocci, M, Bellesia, B
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172396

Ejemplares similares