Insulation vacuum and beam vacuum overpressure release

There is evidence that the incident of 19th September caused a high pressure build-up inside the cryostat insulation vacuum which the existing overpressure devices could not contain. As a result, high longitudinal forces acting on the insulation vacuum barriers developed and broke the floor and the...

Descripción completa

Detalles Bibliográficos
Autor principal: Parma, V
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172399
_version_ 1780916167559348224
author Parma, V
author_facet Parma, V
author_sort Parma, V
collection CERN
description There is evidence that the incident of 19th September caused a high pressure build-up inside the cryostat insulation vacuum which the existing overpressure devices could not contain. As a result, high longitudinal forces acting on the insulation vacuum barriers developed and broke the floor and the floor fixations of the SSS with vacuum barriers. The consequent large longitudinal displacements of the SSS damaged chains of adjacent dipole cryo-magnets. Estimates of the helium mass flow and the pressure build- up experienced in the incident are presented together with the pressure build-up for an even more hazardous event, the Maximum Credible Incident (MCI). The strategy of limiting the maximum pressure by the installation of addition pressure relieve devices is presented and discussed. Both beam vacuum lines were ruptured during the incident in sector 3-4 giving rise to both mechanical damage and pollution of the system. The sequence, causes and effects of this damage will be briefly reviewed. We will then analyse possible actions that could be taken to minimize the impact of a similar incident on the operation of the LHC.
id cern-1172399
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11723992019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172399engParma, VInsulation vacuum and beam vacuum overpressure releaseAccelerators and Storage RingsThere is evidence that the incident of 19th September caused a high pressure build-up inside the cryostat insulation vacuum which the existing overpressure devices could not contain. As a result, high longitudinal forces acting on the insulation vacuum barriers developed and broke the floor and the floor fixations of the SSS with vacuum barriers. The consequent large longitudinal displacements of the SSS damaged chains of adjacent dipole cryo-magnets. Estimates of the helium mass flow and the pressure build- up experienced in the incident are presented together with the pressure build-up for an even more hazardous event, the Maximum Credible Incident (MCI). The strategy of limiting the maximum pressure by the installation of addition pressure relieve devices is presented and discussed. Both beam vacuum lines were ruptured during the incident in sector 3-4 giving rise to both mechanical damage and pollution of the system. The sequence, causes and effects of this damage will be briefly reviewed. We will then analyse possible actions that could be taken to minimize the impact of a similar incident on the operation of the LHC.oai:cds.cern.ch:11723992009
spellingShingle Accelerators and Storage Rings
Parma, V
Insulation vacuum and beam vacuum overpressure release
title Insulation vacuum and beam vacuum overpressure release
title_full Insulation vacuum and beam vacuum overpressure release
title_fullStr Insulation vacuum and beam vacuum overpressure release
title_full_unstemmed Insulation vacuum and beam vacuum overpressure release
title_short Insulation vacuum and beam vacuum overpressure release
title_sort insulation vacuum and beam vacuum overpressure release
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172399
work_keys_str_mv AT parmav insulationvacuumandbeamvacuumoverpressurerelease