Risk Analysis for the Different Consolidation Proposals

In parallel with the repairs in sector 34, improvements are planned to a number of systems, to allow safe detection of faults similar to the one which caused the incident of 19 September, and to limit the damage should a similar incident nonetheless occur. These include improved bus and quench detec...

Descripción completa

Detalles Bibliográficos
Autor principal: Strait, J
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172403
_version_ 1780916168416034816
author Strait, J
author_facet Strait, J
author_sort Strait, J
collection CERN
description In parallel with the repairs in sector 34, improvements are planned to a number of systems, to allow safe detection of faults similar to the one which caused the incident of 19 September, and to limit the damage should a similar incident nonetheless occur. These include improved bus and quench detection systems, improved pressure relief for the insulating and beam vacuum systems, and improved anchoring of the SSS to the tunnel floor. Not all of the planned mitigations, however, may be fully implemented before the restart of the LHC in 2009. I will review the potential benefits of partial or complete implementation of each of the planned improvements, individually or together with others, and conversely the potential risks (consequences) of delayed implementation. I will also review the risks that remain even after the planned consolidation is complete. Considering all proposals and the different risks, I will comment on what would be the best strategy for consolidation, and on the strategy for operations under different consolidation scenarios.
id cern-1172403
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11724032019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172403engStrait, JRisk Analysis for the Different Consolidation ProposalsAccelerators and Storage RingsIn parallel with the repairs in sector 34, improvements are planned to a number of systems, to allow safe detection of faults similar to the one which caused the incident of 19 September, and to limit the damage should a similar incident nonetheless occur. These include improved bus and quench detection systems, improved pressure relief for the insulating and beam vacuum systems, and improved anchoring of the SSS to the tunnel floor. Not all of the planned mitigations, however, may be fully implemented before the restart of the LHC in 2009. I will review the potential benefits of partial or complete implementation of each of the planned improvements, individually or together with others, and conversely the potential risks (consequences) of delayed implementation. I will also review the risks that remain even after the planned consolidation is complete. Considering all proposals and the different risks, I will comment on what would be the best strategy for consolidation, and on the strategy for operations under different consolidation scenarios.oai:cds.cern.ch:11724032009
spellingShingle Accelerators and Storage Rings
Strait, J
Risk Analysis for the Different Consolidation Proposals
title Risk Analysis for the Different Consolidation Proposals
title_full Risk Analysis for the Different Consolidation Proposals
title_fullStr Risk Analysis for the Different Consolidation Proposals
title_full_unstemmed Risk Analysis for the Different Consolidation Proposals
title_short Risk Analysis for the Different Consolidation Proposals
title_sort risk analysis for the different consolidation proposals
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172403
work_keys_str_mv AT straitj riskanalysisforthedifferentconsolidationproposals