Cargando…
Transfer lines and Injection: results from machine studies during beam commissioning
Beam commissioning of the SPS to LHC transfer lines performed during the summer 2008 is reported. The emphasis is put on the optical checks measured for the first time in the last part of the lines and into the LHC. In particular, extensive trajectory studies, dispersion measurements and coupling an...
Autor principal: | Meddahi, M |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172819 |
Ejemplares similares
-
Machine studies during beam commissioning of the SPS-to-LHC transfer lines
por: Meddahi, M, et al.
Publicado: (2009) -
Commissioning with beam of the LHC transfer lines and injection systems
por: Goddard, B
Publicado: (2005) -
Beam commissioning of injection into the LHC
por: Mertens, V, et al.
Publicado: (2009) -
LHC injection and transfer lines
por: Meddahi, Malika
Publicado: (2010) -
Results from the HiRadMat Primary Beam Line Commissioning
por: Hessler, C, et al.
Publicado: (2011)