Cargando…

First Results from the LHC Beam Instrumentation Systems

During the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the...

Descripción completa

Detalles Bibliográficos
Autor principal: Jones, R
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172821
_version_ 1780916180043694080
author Jones, R
author_facet Jones, R
author_sort Jones, R
collection CERN
description During the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scitillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the problems observed and the improvements to be implemented before the next LHC run.
id cern-1172821
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172821engJones, RFirst Results from the LHC Beam Instrumentation SystemsAccelerators and Storage RingsDuring the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scitillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the problems observed and the improvements to be implemented before the next LHC run.oai:cds.cern.ch:11728212009
spellingShingle Accelerators and Storage Rings
Jones, R
First Results from the LHC Beam Instrumentation Systems
title First Results from the LHC Beam Instrumentation Systems
title_full First Results from the LHC Beam Instrumentation Systems
title_fullStr First Results from the LHC Beam Instrumentation Systems
title_full_unstemmed First Results from the LHC Beam Instrumentation Systems
title_short First Results from the LHC Beam Instrumentation Systems
title_sort first results from the lhc beam instrumentation systems
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172821
work_keys_str_mv AT jonesr firstresultsfromthelhcbeaminstrumentationsystems