First Results from the LHC Beam Instrumentation Systems
During the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172821 |
_version_ | 1780916180043694080 |
---|---|
author | Jones, R |
author_facet | Jones, R |
author_sort | Jones, R |
collection | CERN |
description | During the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scitillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the problems observed and the improvements to be implemented before the next LHC run. |
id | cern-1172821 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-11728212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172821engJones, RFirst Results from the LHC Beam Instrumentation SystemsAccelerators and Storage RingsDuring the 2008 LHC injection synchronisation tests and the subsequent days with circualting beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scitillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the problems observed and the improvements to be implemented before the next LHC run.oai:cds.cern.ch:11728212009 |
spellingShingle | Accelerators and Storage Rings Jones, R First Results from the LHC Beam Instrumentation Systems |
title | First Results from the LHC Beam Instrumentation Systems |
title_full | First Results from the LHC Beam Instrumentation Systems |
title_fullStr | First Results from the LHC Beam Instrumentation Systems |
title_full_unstemmed | First Results from the LHC Beam Instrumentation Systems |
title_short | First Results from the LHC Beam Instrumentation Systems |
title_sort | first results from the lhc beam instrumentation systems |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1172821 |
work_keys_str_mv | AT jonesr firstresultsfromthelhcbeaminstrumentationsystems |