Magnet Circuits

The LHC has 1572 superconducting circuits. Most of the time and resources during the Hardware Commissioning were consumed by tests of each circuit of the collider, the so-called powering tests. The tests consisted in carrying out several powering cycles at different current levels for each supercond...

Descripción completa

Detalles Bibliográficos
Autores principales: Vergara Fernandez, A, Bellesia, B, Saban, R, Solfaroli Camillocci, M, Pojer, M, Schmidt, R
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172824
_version_ 1780916180812300288
author Vergara Fernandez, A
Bellesia, B
Saban, R
Solfaroli Camillocci, M
Pojer, M
Schmidt, R
author_facet Vergara Fernandez, A
Bellesia, B
Saban, R
Solfaroli Camillocci, M
Pojer, M
Schmidt, R
author_sort Vergara Fernandez, A
collection CERN
description The LHC has 1572 superconducting circuits. Most of the time and resources during the Hardware Commissioning were consumed by tests of each circuit of the collider, the so-called powering tests. The tests consisted in carrying out several powering cycles at different current levels for each superconducting circuit. The number of tests needed for each sector was around 1500, thus more than 12000 for the whole machine. The aim for the 2009 campaign is to minimise the total time needed for re-commissioning these circuits before beam operation at 5 TeV. This will be done by reducing the number of steps needed for those circuits which have been already commissioned in a similar way as it was done for the second commissioning campaign in sector 4-5 and by optimising the test planning and execution applying the huge experience gathered in the last two years of powering tests. The special powering plan designed for sector 3-4 and the commissioning of the new systems such as the QPS upgrade are also presented.
id cern-1172824
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728242019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172824engVergara Fernandez, ABellesia, BSaban, RSolfaroli Camillocci, MPojer, MSchmidt, RMagnet CircuitsAccelerators and Storage RingsThe LHC has 1572 superconducting circuits. Most of the time and resources during the Hardware Commissioning were consumed by tests of each circuit of the collider, the so-called powering tests. The tests consisted in carrying out several powering cycles at different current levels for each superconducting circuit. The number of tests needed for each sector was around 1500, thus more than 12000 for the whole machine. The aim for the 2009 campaign is to minimise the total time needed for re-commissioning these circuits before beam operation at 5 TeV. This will be done by reducing the number of steps needed for those circuits which have been already commissioned in a similar way as it was done for the second commissioning campaign in sector 4-5 and by optimising the test planning and execution applying the huge experience gathered in the last two years of powering tests. The special powering plan designed for sector 3-4 and the commissioning of the new systems such as the QPS upgrade are also presented.oai:cds.cern.ch:11728242009
spellingShingle Accelerators and Storage Rings
Vergara Fernandez, A
Bellesia, B
Saban, R
Solfaroli Camillocci, M
Pojer, M
Schmidt, R
Magnet Circuits
title Magnet Circuits
title_full Magnet Circuits
title_fullStr Magnet Circuits
title_full_unstemmed Magnet Circuits
title_short Magnet Circuits
title_sort magnet circuits
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172824
work_keys_str_mv AT vergarafernandeza magnetcircuits
AT bellesiab magnetcircuits
AT sabanr magnetcircuits
AT solfarolicamilloccim magnetcircuits
AT pojerm magnetcircuits
AT schmidtr magnetcircuits