Cargando…
Injection and Beam Dump
The hardware changes and maintenance actions on the LHC injection and beam dumping systems will be presented. The requirements for equipment tests, hardware commissioning and machine check-out will be given, highlighting the dependence and the impact on other interfaced LHC equipment.
Autor principal: | Uythoven, J |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172827 |
Ejemplares similares
-
Challenges and plans for injection and beam dump
por: Barnes, M, et al.
Publicado: (2015) -
Beam dumping system and abort gap
por: Uythoven, J
Publicado: (2010) -
Aperture Measurements of the LHC Injection Regions and Beam Dump Systems
por: Goddard, B, et al.
Publicado: (2010) -
Injection and beam dump
por: Goddard, B
Publicado: (2009) -
Chapter 14: Injection and Dumping Systems
por: Goddard, B., et al.
Publicado: (2015)