RF Preparation for Beam in 2009

Modifications to the ACS cavity tuning systems should be completed early in 2009. First tests on the power and low level RF systems will be done with waveguide shorts, as the cavities will be warm and the RUX45 tunnel roof blocks will still be open to allow transport of quadrupoles into sector 3-4....

Descripción completa

Detalles Bibliográficos
Autor principal: Ciapala, Edmond
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172828
_version_ 1780916181775941632
author Ciapala, Edmond
author_facet Ciapala, Edmond
author_sort Ciapala, Edmond
collection CERN
description Modifications to the ACS cavity tuning systems should be completed early in 2009. First tests on the power and low level RF systems will be done with waveguide shorts, as the cavities will be warm and the RUX45 tunnel roof blocks will still be open to allow transport of quadrupoles into sector 3-4. Any co-activity with magnet transport will need to be avoided till the installation of sector 3-4 is completed. Well before beam, the cavities will need to be cooled down and tuning and calibration checked. A period of cavity conditioning will certainly also be required. After cavity conditioning there will be a final check on the cavity tuning and RF feedback systems. These activities all require availability of 4.5 K cryogenics, in sectors 3-4 and 4-5. The beam control systems in UX45 will also be checked as far as possible before beam, together with remote controls and signal monitoring systems. A description of this work, the times needed for the various activities and a planning will be presented. Work on the ADT systems will be carried out in parallel.
id cern-1172828
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728282019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172828engCiapala, EdmondRF Preparation for Beam in 2009Accelerators and Storage RingsModifications to the ACS cavity tuning systems should be completed early in 2009. First tests on the power and low level RF systems will be done with waveguide shorts, as the cavities will be warm and the RUX45 tunnel roof blocks will still be open to allow transport of quadrupoles into sector 3-4. Any co-activity with magnet transport will need to be avoided till the installation of sector 3-4 is completed. Well before beam, the cavities will need to be cooled down and tuning and calibration checked. A period of cavity conditioning will certainly also be required. After cavity conditioning there will be a final check on the cavity tuning and RF feedback systems. These activities all require availability of 4.5 K cryogenics, in sectors 3-4 and 4-5. The beam control systems in UX45 will also be checked as far as possible before beam, together with remote controls and signal monitoring systems. A description of this work, the times needed for the various activities and a planning will be presented. Work on the ADT systems will be carried out in parallel.oai:cds.cern.ch:11728282009
spellingShingle Accelerators and Storage Rings
Ciapala, Edmond
RF Preparation for Beam in 2009
title RF Preparation for Beam in 2009
title_full RF Preparation for Beam in 2009
title_fullStr RF Preparation for Beam in 2009
title_full_unstemmed RF Preparation for Beam in 2009
title_short RF Preparation for Beam in 2009
title_sort rf preparation for beam in 2009
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172828
work_keys_str_mv AT ciapalaedmond rfpreparationforbeamin2009