RF Preparation for Beam in 2009

Modifications to the ACS cavity tuning systems should be completed early in 2009. First tests on the power and low level RF systems will be done with waveguide shorts, as the cavities will be warm and the RUX45 tunnel roof blocks will still be open to allow transport of quadrupoles into sector 3-4....