Cargando…
Readiness of and plans for the injectors for 2009
A large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of th...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172834 |
_version_ | 1780916183102390272 |
---|---|
author | Métral, E |
author_facet | Métral, E |
author_sort | Métral, E |
collection | CERN |
description | A large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of the different beams with intermediate intensities per bunch. The purpose of the present paper is twofold: firstly, review the status of the proton beams in all their forms, which could be delivered by the injectors in 2009 on request from the LHC; secondly, summarize the situation with the ions and in particular the SPS commissioning with the early ion beam, which took place at the end of the 2007 run. |
id | cern-1172834 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-11728342019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172834engMétral, EReadiness of and plans for the injectors for 2009Accelerators and Storage RingsA large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of the different beams with intermediate intensities per bunch. The purpose of the present paper is twofold: firstly, review the status of the proton beams in all their forms, which could be delivered by the injectors in 2009 on request from the LHC; secondly, summarize the situation with the ions and in particular the SPS commissioning with the early ion beam, which took place at the end of the 2007 run.oai:cds.cern.ch:11728342009 |
spellingShingle | Accelerators and Storage Rings Métral, E Readiness of and plans for the injectors for 2009 |
title | Readiness of and plans for the injectors for 2009 |
title_full | Readiness of and plans for the injectors for 2009 |
title_fullStr | Readiness of and plans for the injectors for 2009 |
title_full_unstemmed | Readiness of and plans for the injectors for 2009 |
title_short | Readiness of and plans for the injectors for 2009 |
title_sort | readiness of and plans for the injectors for 2009 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1172834 |
work_keys_str_mv | AT metrale readinessofandplansfortheinjectorsfor2009 |