Readiness of and plans for the injectors for 2009

A large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of th...

Descripción completa

Detalles Bibliográficos
Autor principal: Métral, E
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172834
_version_ 1780916183102390272
author Métral, E
author_facet Métral, E
author_sort Métral, E
collection CERN
description A large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of the different beams with intermediate intensities per bunch. The purpose of the present paper is twofold: firstly, review the status of the proton beams in all their forms, which could be delivered by the injectors in 2009 on request from the LHC; secondly, summarize the situation with the ions and in particular the SPS commissioning with the early ion beam, which took place at the end of the 2007 run.
id cern-1172834
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728342019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172834engMétral, EReadiness of and plans for the injectors for 2009Accelerators and Storage RingsA large diversity of beams have been prepared in the LHC injectors in the past few years, such as single-bunch and multi-bunch beams, with 25 ns and 75 ns bunch spacings. In 2008 the efforts were mainly devoted to the revival of the multi-bunch beam with 50 ns bunch spacing, and the production of the different beams with intermediate intensities per bunch. The purpose of the present paper is twofold: firstly, review the status of the proton beams in all their forms, which could be delivered by the injectors in 2009 on request from the LHC; secondly, summarize the situation with the ions and in particular the SPS commissioning with the early ion beam, which took place at the end of the 2007 run.oai:cds.cern.ch:11728342009
spellingShingle Accelerators and Storage Rings
Métral, E
Readiness of and plans for the injectors for 2009
title Readiness of and plans for the injectors for 2009
title_full Readiness of and plans for the injectors for 2009
title_fullStr Readiness of and plans for the injectors for 2009
title_full_unstemmed Readiness of and plans for the injectors for 2009
title_short Readiness of and plans for the injectors for 2009
title_sort readiness of and plans for the injectors for 2009
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172834
work_keys_str_mv AT metrale readinessofandplansfortheinjectorsfor2009