Are we ready for the 2009 beam operation?

In preparation for the 2008 LHC beam operation, commissioning procedures were established by the commissioning team to safely bring up the LHC performance from the initial beam tests to the first 7 TeV physics runs with reduced intensity and intermediate beta* values. The status of the procedures an...

Descripción completa

Detalles Bibliográficos
Autores principales: Redaelli, S, Alemany-Fernandez, R, Bailey, R, Gruwé, M, Kain, V, MacPherson, A, Ponce, L, Venturini-Delsolaro, W
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172835
_version_ 1780916183314202624
author Redaelli, S
Alemany-Fernandez, R
Bailey, R
Gruwé, M
Kain, V
MacPherson, A
Ponce, L
Venturini-Delsolaro, W
author_facet Redaelli, S
Alemany-Fernandez, R
Bailey, R
Gruwé, M
Kain, V
MacPherson, A
Ponce, L
Venturini-Delsolaro, W
author_sort Redaelli, S
collection CERN
description In preparation for the 2008 LHC beam operation, commissioning procedures were established by the commissioning team to safely bring up the LHC performance from the initial beam tests to the first 7 TeV physics runs with reduced intensity and intermediate beta* values. The status of the procedures and their usage during the 2008 beam experience is reviewed. The improvements needed for the 2009 operation, in particular as far as the squeeze, luminosity performance, backgrounds and operating at reduced beam energies are concerned, are discussed. Requirements for ion operation are also presented.
id cern-1172835
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728352019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172835engRedaelli, SAlemany-Fernandez, RBailey, RGruwé, MKain, VMacPherson, APonce, LVenturini-Delsolaro, WAre we ready for the 2009 beam operation?Accelerators and Storage RingsIn preparation for the 2008 LHC beam operation, commissioning procedures were established by the commissioning team to safely bring up the LHC performance from the initial beam tests to the first 7 TeV physics runs with reduced intensity and intermediate beta* values. The status of the procedures and their usage during the 2008 beam experience is reviewed. The improvements needed for the 2009 operation, in particular as far as the squeeze, luminosity performance, backgrounds and operating at reduced beam energies are concerned, are discussed. Requirements for ion operation are also presented.oai:cds.cern.ch:11728352009
spellingShingle Accelerators and Storage Rings
Redaelli, S
Alemany-Fernandez, R
Bailey, R
Gruwé, M
Kain, V
MacPherson, A
Ponce, L
Venturini-Delsolaro, W
Are we ready for the 2009 beam operation?
title Are we ready for the 2009 beam operation?
title_full Are we ready for the 2009 beam operation?
title_fullStr Are we ready for the 2009 beam operation?
title_full_unstemmed Are we ready for the 2009 beam operation?
title_short Are we ready for the 2009 beam operation?
title_sort are we ready for the 2009 beam operation?
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172835
work_keys_str_mv AT redaellis arewereadyforthe2009beamoperation
AT alemanyfernandezr arewereadyforthe2009beamoperation
AT baileyr arewereadyforthe2009beamoperation
AT gruwem arewereadyforthe2009beamoperation
AT kainv arewereadyforthe2009beamoperation
AT macphersona arewereadyforthe2009beamoperation
AT poncel arewereadyforthe2009beamoperation
AT venturinidelsolarow arewereadyforthe2009beamoperation