Cargando…
Are we ready for the 2009 beam operation?
In preparation for the 2008 LHC beam operation, commissioning procedures were established by the commissioning team to safely bring up the LHC performance from the initial beam tests to the first 7 TeV physics runs with reduced intensity and intermediate beta* values. The status of the procedures an...
Autores principales: | Redaelli, S, Alemany-Fernandez, R, Bailey, R, Gruwé, M, Kain, V, MacPherson, A, Ponce, L, Venturini-Delsolaro, W |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172835 |
Ejemplares similares
-
Operational Experience with First Circulating Beam in the LHC
por: Lamont, M, et al.
Publicado: (2009) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010) -
The LHC Injection Tests
por: Lamont, M, et al.
Publicado: (2009) -
Operational experience during the LHC injection tests
por: Fuchsberger, K, et al.
Publicado: (2010) -
Operation of the LHC at High luminosity and High stored energy
por: Wenninger, J, et al.
Publicado: (2012)