Cargando…

Hardware and Initial Beam Commissioning of the LHC RF Systems

Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operationa...

Descripción completa

Detalles Bibliográficos
Autores principales: Linnecar, T, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Butterworth, A, Ciapala, Edmond, Dubouchet, F, Ferreira-Bento, J, Glenat, D, Hagmann, G, Höfle, Wolfgang, Julie, C, Killing, F, Kotzian, G, Landre, D, Louwerse, R, Maesen, P, Martinez-Yanez, P, Molendijk, J, Montesinos, E, Nicou, C, Noirjean, J, Papotti, G, Pashnin, A, Pechaud, G, Pradier, J, Rossi, V, Sanchez-Quesada, J, Schokker, M, Shaposhnikova, E, Sorokoletev, R, Stellfeld, D, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1176380
_version_ 1780916249540165632
author Linnecar, T
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Butterworth, A
Ciapala, Edmond
Dubouchet, F
Ferreira-Bento, J
Glenat, D
Hagmann, G
Höfle, Wolfgang
Julie, C
Killing, F
Kotzian, G
Landre, D
Louwerse, R
Maesen, P
Martinez-Yanez, P
Molendijk, J
Montesinos, E
Nicou, C
Noirjean, J
Papotti, G
Pashnin, A
Pechaud, G
Pradier, J
Rossi, V
Sanchez-Quesada, J
Schokker, M
Shaposhnikova, E
Sorokoletev, R
Stellfeld, D
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
author_facet Linnecar, T
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Butterworth, A
Ciapala, Edmond
Dubouchet, F
Ferreira-Bento, J
Glenat, D
Hagmann, G
Höfle, Wolfgang
Julie, C
Killing, F
Kotzian, G
Landre, D
Louwerse, R
Maesen, P
Martinez-Yanez, P
Molendijk, J
Montesinos, E
Nicou, C
Noirjean, J
Papotti, G
Pashnin, A
Pechaud, G
Pradier, J
Rossi, V
Sanchez-Quesada, J
Schokker, M
Shaposhnikova, E
Sorokoletev, R
Stellfeld, D
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
author_sort Linnecar, T
collection CERN
description Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operational for the LHC synchronization tests in August 2008. The very first beams through IP4 were observed on the RF monitors and beam 2 was captured on 11th September. Measurements with beam on the damper systems were also pos-sible, preparing the way for closing the damper loop with beam. Major milestones during commissioning the ACS and ADT systems and results obtained during first capture tests are presented. Preparatory work for acceleration and multi-bunch operation is described as are the beam tests foreseen for 2009.
id cern-1176380
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11763802023-05-31T13:22:16Zhttp://cds.cern.ch/record/1176380engLinnecar, TAngoletta, M EArnaudon, LBaudrenghien, PBohl, TBrunner, OButterworth, ACiapala, EdmondDubouchet, FFerreira-Bento, JGlenat, DHagmann, GHöfle, WolfgangJulie, CKilling, FKotzian, GLandre, DLouwerse, RMaesen, PMartinez-Yanez, PMolendijk, JMontesinos, ENicou, CNoirjean, JPapotti, GPashnin, APechaud, GPradier, JRossi, VSanchez-Quesada, JSchokker, MShaposhnikova, ESorokoletev, RStellfeld, DTückmantel, JoachimValuch, DWehrle, UWeierud, FHardware and Initial Beam Commissioning of the LHC RF SystemsAccelerators and Storage RingsHardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operational for the LHC synchronization tests in August 2008. The very first beams through IP4 were observed on the RF monitors and beam 2 was captured on 11th September. Measurements with beam on the damper systems were also pos-sible, preparing the way for closing the damper loop with beam. Major milestones during commissioning the ACS and ADT systems and results obtained during first capture tests are presented. Preparatory work for acceleration and multi-bunch operation is described as are the beam tests foreseen for 2009.LHC-PROJECT-Report-1172CERN-LHC-PROJECT-Report-1172oai:cds.cern.ch:11763802008-10-07
spellingShingle Accelerators and Storage Rings
Linnecar, T
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Butterworth, A
Ciapala, Edmond
Dubouchet, F
Ferreira-Bento, J
Glenat, D
Hagmann, G
Höfle, Wolfgang
Julie, C
Killing, F
Kotzian, G
Landre, D
Louwerse, R
Maesen, P
Martinez-Yanez, P
Molendijk, J
Montesinos, E
Nicou, C
Noirjean, J
Papotti, G
Pashnin, A
Pechaud, G
Pradier, J
Rossi, V
Sanchez-Quesada, J
Schokker, M
Shaposhnikova, E
Sorokoletev, R
Stellfeld, D
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
Hardware and Initial Beam Commissioning of the LHC RF Systems
title Hardware and Initial Beam Commissioning of the LHC RF Systems
title_full Hardware and Initial Beam Commissioning of the LHC RF Systems
title_fullStr Hardware and Initial Beam Commissioning of the LHC RF Systems
title_full_unstemmed Hardware and Initial Beam Commissioning of the LHC RF Systems
title_short Hardware and Initial Beam Commissioning of the LHC RF Systems
title_sort hardware and initial beam commissioning of the lhc rf systems
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1176380
work_keys_str_mv AT linnecart hardwareandinitialbeamcommissioningofthelhcrfsystems
AT angolettame hardwareandinitialbeamcommissioningofthelhcrfsystems
AT arnaudonl hardwareandinitialbeamcommissioningofthelhcrfsystems
AT baudrenghienp hardwareandinitialbeamcommissioningofthelhcrfsystems
AT bohlt hardwareandinitialbeamcommissioningofthelhcrfsystems
AT brunnero hardwareandinitialbeamcommissioningofthelhcrfsystems
AT butterwortha hardwareandinitialbeamcommissioningofthelhcrfsystems
AT ciapalaedmond hardwareandinitialbeamcommissioningofthelhcrfsystems
AT dubouchetf hardwareandinitialbeamcommissioningofthelhcrfsystems
AT ferreirabentoj hardwareandinitialbeamcommissioningofthelhcrfsystems
AT glenatd hardwareandinitialbeamcommissioningofthelhcrfsystems
AT hagmanng hardwareandinitialbeamcommissioningofthelhcrfsystems
AT hoflewolfgang hardwareandinitialbeamcommissioningofthelhcrfsystems
AT juliec hardwareandinitialbeamcommissioningofthelhcrfsystems
AT killingf hardwareandinitialbeamcommissioningofthelhcrfsystems
AT kotziang hardwareandinitialbeamcommissioningofthelhcrfsystems
AT landred hardwareandinitialbeamcommissioningofthelhcrfsystems
AT louwerser hardwareandinitialbeamcommissioningofthelhcrfsystems
AT maesenp hardwareandinitialbeamcommissioningofthelhcrfsystems
AT martinezyanezp hardwareandinitialbeamcommissioningofthelhcrfsystems
AT molendijkj hardwareandinitialbeamcommissioningofthelhcrfsystems
AT montesinose hardwareandinitialbeamcommissioningofthelhcrfsystems
AT nicouc hardwareandinitialbeamcommissioningofthelhcrfsystems
AT noirjeanj hardwareandinitialbeamcommissioningofthelhcrfsystems
AT papottig hardwareandinitialbeamcommissioningofthelhcrfsystems
AT pashnina hardwareandinitialbeamcommissioningofthelhcrfsystems
AT pechaudg hardwareandinitialbeamcommissioningofthelhcrfsystems
AT pradierj hardwareandinitialbeamcommissioningofthelhcrfsystems
AT rossiv hardwareandinitialbeamcommissioningofthelhcrfsystems
AT sanchezquesadaj hardwareandinitialbeamcommissioningofthelhcrfsystems
AT schokkerm hardwareandinitialbeamcommissioningofthelhcrfsystems
AT shaposhnikovae hardwareandinitialbeamcommissioningofthelhcrfsystems
AT sorokoletevr hardwareandinitialbeamcommissioningofthelhcrfsystems
AT stellfeldd hardwareandinitialbeamcommissioningofthelhcrfsystems
AT tuckmanteljoachim hardwareandinitialbeamcommissioningofthelhcrfsystems
AT valuchd hardwareandinitialbeamcommissioningofthelhcrfsystems
AT wehrleu hardwareandinitialbeamcommissioningofthelhcrfsystems
AT weierudf hardwareandinitialbeamcommissioningofthelhcrfsystems