Cargando…
Hardware and Initial Beam Commissioning of the LHC RF Systems
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operationa...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1176380 |
_version_ | 1780916249540165632 |
---|---|
author | Linnecar, T Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Butterworth, A Ciapala, Edmond Dubouchet, F Ferreira-Bento, J Glenat, D Hagmann, G Höfle, Wolfgang Julie, C Killing, F Kotzian, G Landre, D Louwerse, R Maesen, P Martinez-Yanez, P Molendijk, J Montesinos, E Nicou, C Noirjean, J Papotti, G Pashnin, A Pechaud, G Pradier, J Rossi, V Sanchez-Quesada, J Schokker, M Shaposhnikova, E Sorokoletev, R Stellfeld, D Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F |
author_facet | Linnecar, T Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Butterworth, A Ciapala, Edmond Dubouchet, F Ferreira-Bento, J Glenat, D Hagmann, G Höfle, Wolfgang Julie, C Killing, F Kotzian, G Landre, D Louwerse, R Maesen, P Martinez-Yanez, P Molendijk, J Montesinos, E Nicou, C Noirjean, J Papotti, G Pashnin, A Pechaud, G Pradier, J Rossi, V Sanchez-Quesada, J Schokker, M Shaposhnikova, E Sorokoletev, R Stellfeld, D Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F |
author_sort | Linnecar, T |
collection | CERN |
description | Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operational for the LHC synchronization tests in August 2008. The very first beams through IP4 were observed on the RF monitors and beam 2 was captured on 11th September. Measurements with beam on the damper systems were also pos-sible, preparing the way for closing the damper loop with beam. Major milestones during commissioning the ACS and ADT systems and results obtained during first capture tests are presented. Preparatory work for acceleration and multi-bunch operation is described as are the beam tests foreseen for 2009. |
id | cern-1176380 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11763802023-05-31T13:22:16Zhttp://cds.cern.ch/record/1176380engLinnecar, TAngoletta, M EArnaudon, LBaudrenghien, PBohl, TBrunner, OButterworth, ACiapala, EdmondDubouchet, FFerreira-Bento, JGlenat, DHagmann, GHöfle, WolfgangJulie, CKilling, FKotzian, GLandre, DLouwerse, RMaesen, PMartinez-Yanez, PMolendijk, JMontesinos, ENicou, CNoirjean, JPapotti, GPashnin, APechaud, GPradier, JRossi, VSanchez-Quesada, JSchokker, MShaposhnikova, ESorokoletev, RStellfeld, DTückmantel, JoachimValuch, DWehrle, UWeierud, FHardware and Initial Beam Commissioning of the LHC RF SystemsAccelerators and Storage RingsHardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operational for the LHC synchronization tests in August 2008. The very first beams through IP4 were observed on the RF monitors and beam 2 was captured on 11th September. Measurements with beam on the damper systems were also pos-sible, preparing the way for closing the damper loop with beam. Major milestones during commissioning the ACS and ADT systems and results obtained during first capture tests are presented. Preparatory work for acceleration and multi-bunch operation is described as are the beam tests foreseen for 2009.LHC-PROJECT-Report-1172CERN-LHC-PROJECT-Report-1172oai:cds.cern.ch:11763802008-10-07 |
spellingShingle | Accelerators and Storage Rings Linnecar, T Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Butterworth, A Ciapala, Edmond Dubouchet, F Ferreira-Bento, J Glenat, D Hagmann, G Höfle, Wolfgang Julie, C Killing, F Kotzian, G Landre, D Louwerse, R Maesen, P Martinez-Yanez, P Molendijk, J Montesinos, E Nicou, C Noirjean, J Papotti, G Pashnin, A Pechaud, G Pradier, J Rossi, V Sanchez-Quesada, J Schokker, M Shaposhnikova, E Sorokoletev, R Stellfeld, D Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F Hardware and Initial Beam Commissioning of the LHC RF Systems |
title | Hardware and Initial Beam Commissioning of the LHC RF Systems |
title_full | Hardware and Initial Beam Commissioning of the LHC RF Systems |
title_fullStr | Hardware and Initial Beam Commissioning of the LHC RF Systems |
title_full_unstemmed | Hardware and Initial Beam Commissioning of the LHC RF Systems |
title_short | Hardware and Initial Beam Commissioning of the LHC RF Systems |
title_sort | hardware and initial beam commissioning of the lhc rf systems |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1176380 |
work_keys_str_mv | AT linnecart hardwareandinitialbeamcommissioningofthelhcrfsystems AT angolettame hardwareandinitialbeamcommissioningofthelhcrfsystems AT arnaudonl hardwareandinitialbeamcommissioningofthelhcrfsystems AT baudrenghienp hardwareandinitialbeamcommissioningofthelhcrfsystems AT bohlt hardwareandinitialbeamcommissioningofthelhcrfsystems AT brunnero hardwareandinitialbeamcommissioningofthelhcrfsystems AT butterwortha hardwareandinitialbeamcommissioningofthelhcrfsystems AT ciapalaedmond hardwareandinitialbeamcommissioningofthelhcrfsystems AT dubouchetf hardwareandinitialbeamcommissioningofthelhcrfsystems AT ferreirabentoj hardwareandinitialbeamcommissioningofthelhcrfsystems AT glenatd hardwareandinitialbeamcommissioningofthelhcrfsystems AT hagmanng hardwareandinitialbeamcommissioningofthelhcrfsystems AT hoflewolfgang hardwareandinitialbeamcommissioningofthelhcrfsystems AT juliec hardwareandinitialbeamcommissioningofthelhcrfsystems AT killingf hardwareandinitialbeamcommissioningofthelhcrfsystems AT kotziang hardwareandinitialbeamcommissioningofthelhcrfsystems AT landred hardwareandinitialbeamcommissioningofthelhcrfsystems AT louwerser hardwareandinitialbeamcommissioningofthelhcrfsystems AT maesenp hardwareandinitialbeamcommissioningofthelhcrfsystems AT martinezyanezp hardwareandinitialbeamcommissioningofthelhcrfsystems AT molendijkj hardwareandinitialbeamcommissioningofthelhcrfsystems AT montesinose hardwareandinitialbeamcommissioningofthelhcrfsystems AT nicouc hardwareandinitialbeamcommissioningofthelhcrfsystems AT noirjeanj hardwareandinitialbeamcommissioningofthelhcrfsystems AT papottig hardwareandinitialbeamcommissioningofthelhcrfsystems AT pashnina hardwareandinitialbeamcommissioningofthelhcrfsystems AT pechaudg hardwareandinitialbeamcommissioningofthelhcrfsystems AT pradierj hardwareandinitialbeamcommissioningofthelhcrfsystems AT rossiv hardwareandinitialbeamcommissioningofthelhcrfsystems AT sanchezquesadaj hardwareandinitialbeamcommissioningofthelhcrfsystems AT schokkerm hardwareandinitialbeamcommissioningofthelhcrfsystems AT shaposhnikovae hardwareandinitialbeamcommissioningofthelhcrfsystems AT sorokoletevr hardwareandinitialbeamcommissioningofthelhcrfsystems AT stellfeldd hardwareandinitialbeamcommissioningofthelhcrfsystems AT tuckmanteljoachim hardwareandinitialbeamcommissioningofthelhcrfsystems AT valuchd hardwareandinitialbeamcommissioningofthelhcrfsystems AT wehrleu hardwareandinitialbeamcommissioningofthelhcrfsystems AT weierudf hardwareandinitialbeamcommissioningofthelhcrfsystems |