Hardware and Initial Beam Commissioning of the LHC RF Systems
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine synchroni-sation systems were in place and operationa...
Autores principales: | Linnecar, T, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Butterworth, A, Ciapala, Edmond, Dubouchet, F, Ferreira-Bento, J, Glenat, D, Hagmann, G, Höfle, Wolfgang, Julie, C, Killing, F, Kotzian, G, Landre, D, Louwerse, R, Maesen, P, Martinez-Yanez, P, Molendijk, J, Montesinos, E, Nicou, C, Noirjean, J, Papotti, G, Pashnin, A, Pechaud, G, Pradier, J, Rossi, V, Sanchez-Quesada, J, Schokker, M, Shaposhnikova, E, Sorokoletev, R, Stellfeld, D, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1176380 |
Ejemplares similares
-
Transverse damper operation
por: Höfle, W, et al.
Publicado: (2010) -
The LHC RF System - Experience with beam operation
por: Baudrenghien, P, et al.
Publicado: (2011) -
First Beam Commissioning of the 400 MHz LHC RF System
por: Butterworth, A C, et al.
Publicado: (2009) -
Commissioning of the 400 MHz LHC RF System
por: Ciapala, Edmond, et al.
Publicado: (2008) -
Digital Design Of The LHC Low Level rf: The Tuning System For The Superconducting Cavities
por: Baudrenghien, P, et al.