PSB LLRF renovation: Initial beam tests of the new digital beam control system

The beam control renovation project for CERN’s PS Booster (PSB) was started in autumn 2008. Its aim is to equip all four PSB rings with modern digital beam control systems, characterised by fully-PPM parameters and complete remote control. Additionally, all intermediate and input/output signals are...

Descripción completa

Detalles Bibliográficos
Autores principales: Angoletta, ME, Blas, A, Butterworth, A, Findlay, A, Pedersen, F
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1181484
_version_ 1780916360204779520
author Angoletta, ME
Blas, A
Butterworth, A
Findlay, A
Pedersen, F
author_facet Angoletta, ME
Blas, A
Butterworth, A
Findlay, A
Pedersen, F
author_sort Angoletta, ME
collection CERN
description The beam control renovation project for CERN’s PS Booster (PSB) was started in autumn 2008. Its aim is to equip all four PSB rings with modern digital beam control systems, characterised by fully-PPM parameters and complete remote control. Additionally, all intermediate and input/output signals are to be remotely acquired in a digital way and in full PPM fashion, and displayed via the Oasis application program. The same digital technology concepts have already been successfully applied to the LEIR beam control system, which has acted as a pilot project for the whole PS Complex renovation project. This new technology allows a very flexible performance and can improve the system maintainability by becoming the standard for the PS Complex beam controls. This note details the first step in the PSB consolidation project, namely the beam control prototype tests carried out on PSB ring 4 in October and November 2008. Both C02 and C04 RF system have been successfully controlled; bunch splitting and extraction synchronisation at harmonics h = 1 and h = 2 have also been carried out. This note gives an overview of the system hardware and software capabilities and of the beam results obtained. Finally, some hints on the future work planned for the PSB consolidation project are provided.
id cern-1181484
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11814842019-09-30T06:29:59Zhttp://cds.cern.ch/record/1181484engAngoletta, MEBlas, AButterworth, AFindlay, APedersen, FPSB LLRF renovation: Initial beam tests of the new digital beam control systemAccelerators and Storage RingsThe beam control renovation project for CERN’s PS Booster (PSB) was started in autumn 2008. Its aim is to equip all four PSB rings with modern digital beam control systems, characterised by fully-PPM parameters and complete remote control. Additionally, all intermediate and input/output signals are to be remotely acquired in a digital way and in full PPM fashion, and displayed via the Oasis application program. The same digital technology concepts have already been successfully applied to the LEIR beam control system, which has acted as a pilot project for the whole PS Complex renovation project. This new technology allows a very flexible performance and can improve the system maintainability by becoming the standard for the PS Complex beam controls. This note details the first step in the PSB consolidation project, namely the beam control prototype tests carried out on PSB ring 4 in October and November 2008. Both C02 and C04 RF system have been successfully controlled; bunch splitting and extraction synchronisation at harmonics h = 1 and h = 2 have also been carried out. This note gives an overview of the system hardware and software capabilities and of the beam results obtained. Finally, some hints on the future work planned for the PSB consolidation project are provided.CERN-BE-Note-2009-021oai:cds.cern.ch:11814842009-06-01
spellingShingle Accelerators and Storage Rings
Angoletta, ME
Blas, A
Butterworth, A
Findlay, A
Pedersen, F
PSB LLRF renovation: Initial beam tests of the new digital beam control system
title PSB LLRF renovation: Initial beam tests of the new digital beam control system
title_full PSB LLRF renovation: Initial beam tests of the new digital beam control system
title_fullStr PSB LLRF renovation: Initial beam tests of the new digital beam control system
title_full_unstemmed PSB LLRF renovation: Initial beam tests of the new digital beam control system
title_short PSB LLRF renovation: Initial beam tests of the new digital beam control system
title_sort psb llrf renovation: initial beam tests of the new digital beam control system
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1181484
work_keys_str_mv AT angolettame psbllrfrenovationinitialbeamtestsofthenewdigitalbeamcontrolsystem
AT blasa psbllrfrenovationinitialbeamtestsofthenewdigitalbeamcontrolsystem
AT butterwortha psbllrfrenovationinitialbeamtestsofthenewdigitalbeamcontrolsystem
AT findlaya psbllrfrenovationinitialbeamtestsofthenewdigitalbeamcontrolsystem
AT pedersenf psbllrfrenovationinitialbeamtestsofthenewdigitalbeamcontrolsystem