Performance of and First Experience with the LHC Beam Diagnostics

During the 2008 LHC injection synchronisation tests and the subsequent days with circulating beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the...

Descripción completa

Detalles Bibliográficos
Autor principal: Jones, O R
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1183396
_version_ 1780916380243066880
author Jones, O R
author_facet Jones, O R
author_sort Jones, O R
collection CERN
description During the 2008 LHC injection synchronisation tests and the subsequent days with circulating beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scintillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the issues observed and what remains to be done for the next LHC run.
id cern-1183396
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11833962019-09-30T06:29:59Zhttp://cds.cern.ch/record/1183396engJones, O RPerformance of and First Experience with the LHC Beam DiagnosticsAccelerators and Storage RingsDuring the 2008 LHC injection synchronisation tests and the subsequent days with circulating beam, the majority of the LHC beam instrumentation systems were capable of measuring their first beam parameters. This included the two large, distributed, beam position and beam loss systems, as well as the scintillating and OTR screen systems, the fast and DC beam current transformer systems, the tune measurement system and the wire scanner system. The fast timing system was also extensively used to synchronise most of this instrumentation. This presentation will comment on the results to date, some of the issues observed and what remains to be done for the next LHC run.CERN-BE-2009-015oai:cds.cern.ch:11833962009-05-01
spellingShingle Accelerators and Storage Rings
Jones, O R
Performance of and First Experience with the LHC Beam Diagnostics
title Performance of and First Experience with the LHC Beam Diagnostics
title_full Performance of and First Experience with the LHC Beam Diagnostics
title_fullStr Performance of and First Experience with the LHC Beam Diagnostics
title_full_unstemmed Performance of and First Experience with the LHC Beam Diagnostics
title_short Performance of and First Experience with the LHC Beam Diagnostics
title_sort performance of and first experience with the lhc beam diagnostics
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1183396
work_keys_str_mv AT jonesor performanceofandfirstexperiencewiththelhcbeamdiagnostics