Cargando…
Design of a new Emittance Meter for LINAC4
LINAC4 is the first step in the upgrade of the injectors chain of the Large Hadron Collider (LHC). This Linac will accelerate H- ions from 45 keV to 160 MeV. During the commissioning phase of LINAC4 transverse emittance measurements will be required at 45 keV, 3 MeV and 12 MeV. For this purpose a sl...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1183416 |
_version_ | 1780916384221364224 |
---|---|
author | Cheymol, B Bravin, E Dutriat, C Lefèvre, T |
author_facet | Cheymol, B Bravin, E Dutriat, C Lefèvre, T |
author_sort | Cheymol, B |
collection | CERN |
description | LINAC4 is the first step in the upgrade of the injectors chain of the Large Hadron Collider (LHC). This Linac will accelerate H- ions from 45 keV to 160 MeV. During the commissioning phase of LINAC4 transverse emittance measurements will be required at 45 keV, 3 MeV and 12 MeV. For this purpose a slit&grid system is currently being developed. The material and the geometry of the wires and of the slit need to be optimized in order to minimize the negative effects of the energy deposition and maximize the signals. This document describes the results of the studies carried out during the design of the emittance meter. |
id | cern-1183416 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-11834162019-09-30T06:29:59Zhttp://cds.cern.ch/record/1183416engCheymol, BBravin, EDutriat, CLefèvre, TDesign of a new Emittance Meter for LINAC4Accelerators and Storage RingsLINAC4 is the first step in the upgrade of the injectors chain of the Large Hadron Collider (LHC). This Linac will accelerate H- ions from 45 keV to 160 MeV. During the commissioning phase of LINAC4 transverse emittance measurements will be required at 45 keV, 3 MeV and 12 MeV. For this purpose a slit&grid system is currently being developed. The material and the geometry of the wires and of the slit need to be optimized in order to minimize the negative effects of the energy deposition and maximize the signals. This document describes the results of the studies carried out during the design of the emittance meter.CERN-BE-2009-029oai:cds.cern.ch:11834162009-05-01 |
spellingShingle | Accelerators and Storage Rings Cheymol, B Bravin, E Dutriat, C Lefèvre, T Design of a new Emittance Meter for LINAC4 |
title | Design of a new Emittance Meter for LINAC4 |
title_full | Design of a new Emittance Meter for LINAC4 |
title_fullStr | Design of a new Emittance Meter for LINAC4 |
title_full_unstemmed | Design of a new Emittance Meter for LINAC4 |
title_short | Design of a new Emittance Meter for LINAC4 |
title_sort | design of a new emittance meter for linac4 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1183416 |
work_keys_str_mv | AT cheymolb designofanewemittancemeterforlinac4 AT bravine designofanewemittancemeterforlinac4 AT dutriatc designofanewemittancemeterforlinac4 AT lefevret designofanewemittancemeterforlinac4 |