Cargando…
Readiness of the ATLAS detector : performance with the first beam and cosmic data
During 2008 the ATLAS experiment went through an intense period of preparation to have the detector fully commissioned for the first beam period. In the about 30 hours of beam time available to ATLAS in 2008, the systems went through a rapid setup sequence, from successfully recording the first ever...
Autor principal: | Pastore, F |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2009.08.068 http://cds.cern.ch/record/1183479 |
Ejemplares similares
-
Readiness of the ATLAS detector : performance with the first beam and cosmic data
por: Pastore, F
Publicado: (2009) -
Commissioning and performance of the ATLAS Inner Detector with the first beam and cosmic data
por: Andreazza, A
Publicado: (2009) -
Commissioning and performance of the ATLAS Inner Detector with first beams and cosmic data
por: Andreazza, A
Publicado: (2009) -
Performance of the ATLAS Detector on First Single Beam and Cosmic Rays Data
por: Aleksa, M
Publicado: (2009) -
ATLAS Detector Commissioning Results with Cosmics and First Beam
por: Cerri, A
Publicado: (2009)