Cargando…
Power distribution, cabling and other reliability issues (ATLAS)
Power distribution has become a critical design issue for the next generation of silicon detectors being planned. The reasons for this are examined, giving examples of power distribution problems in the present Large Hadron Collider. Options are discussed for implementing power distribution at highe...
Autor principal: | García-Sciveres, M |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1187291 |
Ejemplares similares
-
Cabling the ATLAS experiment
por: Hatch, M
Publicado: (2003) -
ATLAS policy on grounding and power distribution
por: Williams, H
Publicado: (1997) -
ATLAS jet quenching plan, needs and other issues
por: The ATLAS collaboration
Publicado: (2009) -
Power Supply and Power Distribution System for the ATLAS Silicon Strip Detectors
por: Malecki, P, et al.
Publicado: (2001) -
Effects of CM and DM noise propagation in LV distribution cables
por: Arteche, F, et al.
Publicado: (2003)