Cargando…
The LHC repairs in detail
Autor principal: | Fabienne Marcastel |
---|---|
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1187560 |
Ejemplares similares
-
Welcome to USA 15, the first large underground hall for the LHC
Publicado: (2001) -
Series fabrication of the main quadrupole cold masses for the LHC begins
Publicado: (2003) -
The experts from the Review of LHC Superconducting Cables and Magnet Production, accompanied by the committee's secretary and the Head of the Magnets and Superconductors Group.
Publicado: (2004) -
The TI2 Tunnel, excavated to a precision of just 6 millimetres, is 2648 metres long and links the SPS to Point 2 of the LEP/LHC ring.
Publicado: (2001) -
ALICE’s new meeting room
por: Mathew Stracy
Publicado: (2009)