ICARUS T600 (CNGS2) Status Report
Since the last presentation to the SPSC committee, the ICARUS T600 detector assembly has progressed up to its completion. The cryogenic plant, the liquefier system, the read-out, the Laboratory infrastructure and the safety facilities have been installed. However the Collaboration had to face some p...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1188563 |
Sumario: | Since the last presentation to the SPSC committee, the ICARUS T600 detector assembly has progressed up to its completion. The cryogenic plant, the liquefier system, the read-out, the Laboratory infrastructure and the safety facilities have been installed. However the Collaboration had to face some problems that have delayed the start-up of the commissioning of the apparatus. Besides the one-month suspension of the activities in the Laboratory, following the seismic event in the l’Aquila region, delays have emerged due to the commissioning of the liquefier system, to the pressure/vacuum leaking of some wire signal feed-through flanges and to the deformation of a panel of the external thermal insulation. |
---|