Beam commissioning of injection into the LHC
The LHC injection tests and first turn beam commissioning took place in late summer 2008, after detailed and thorough preparation. The beam commissioning of the downstream sections of the SPS-to-LHC transfer lines and the LHC injection systems is described. The details of the aperture measurements i...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1199752 |
_version_ | 1780917492957315072 |
---|---|
author | Mertens, V Agapov, I Goddard, B Gyr, M Kain, V Kramer, T Lamont, M Meddahi, M Uythoven, J Wenninger, J |
author_facet | Mertens, V Agapov, I Goddard, B Gyr, M Kain, V Kramer, T Lamont, M Meddahi, M Uythoven, J Wenninger, J |
author_sort | Mertens, V |
collection | CERN |
description | The LHC injection tests and first turn beam commissioning took place in late summer 2008, after detailed and thorough preparation. The beam commissioning of the downstream sections of the SPS-to-LHC transfer lines and the LHC injection systems is described. The details of the aperture measurements in the injection regions are presented together with the performance of the injection related equipment. The measured injection stability is compared to the expectations. The operational issues encountered are discussed. |
id | cern-1199752 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-11997522019-09-30T06:29:59Zhttp://cds.cern.ch/record/1199752engMertens, VAgapov, IGoddard, BGyr, MKain, VKramer, TLamont, MMeddahi, MUythoven, JWenninger, JBeam commissioning of injection into the LHCAccelerators and Storage RingsThe LHC injection tests and first turn beam commissioning took place in late summer 2008, after detailed and thorough preparation. The beam commissioning of the downstream sections of the SPS-to-LHC transfer lines and the LHC injection systems is described. The details of the aperture measurements in the injection regions are presented together with the performance of the injection related equipment. The measured injection stability is compared to the expectations. The operational issues encountered are discussed.CERN-ATS-2009-012oai:cds.cern.ch:11997522009-07-31 |
spellingShingle | Accelerators and Storage Rings Mertens, V Agapov, I Goddard, B Gyr, M Kain, V Kramer, T Lamont, M Meddahi, M Uythoven, J Wenninger, J Beam commissioning of injection into the LHC |
title | Beam commissioning of injection into the LHC |
title_full | Beam commissioning of injection into the LHC |
title_fullStr | Beam commissioning of injection into the LHC |
title_full_unstemmed | Beam commissioning of injection into the LHC |
title_short | Beam commissioning of injection into the LHC |
title_sort | beam commissioning of injection into the lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1199752 |
work_keys_str_mv | AT mertensv beamcommissioningofinjectionintothelhc AT agapovi beamcommissioningofinjectionintothelhc AT goddardb beamcommissioningofinjectionintothelhc AT gyrm beamcommissioningofinjectionintothelhc AT kainv beamcommissioningofinjectionintothelhc AT kramert beamcommissioningofinjectionintothelhc AT lamontm beamcommissioningofinjectionintothelhc AT meddahim beamcommissioningofinjectionintothelhc AT uythovenj beamcommissioningofinjectionintothelhc AT wenningerj beamcommissioningofinjectionintothelhc |