Beam commissioning of injection into the LHC
The LHC injection tests and first turn beam commissioning took place in late summer 2008, after detailed and thorough preparation. The beam commissioning of the downstream sections of the SPS-to-LHC transfer lines and the LHC injection systems is described. The details of the aperture measurements i...
Autores principales: | Mertens, V, Agapov, I, Goddard, B, Gyr, M, Kain, V, Kramer, T, Lamont, M, Meddahi, M, Uythoven, J, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1199752 |
Ejemplares similares
-
Initial results from beam commissioning of the LHC beam dump system
por: Goddard, B, et al.
Publicado: (2009) -
Machine studies during beam commissioning of the SPS-to-LHC transfer lines
por: Meddahi, M, et al.
Publicado: (2009) -
Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
por: Uythoven, J, et al.
Publicado: (2008) -
Kick response measurements during LHC injection tests and early LHC Beam commissioning
por: Fuchsberger, K, et al.
Publicado: (2010) -
Aperture Measurements of the LHC Injection Regions and Beam Dump Systems
por: Goddard, B, et al.