Machine studies during beam commissioning of the SPS-to-LHC transfer lines
Through May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was performed. For the first time, optics and dispersion measurements were also taken in the last part of the lines, and into the LHC. Extensive trajectory and optics studies were conducted, in parallel with h...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1199754 |
_version_ | 1780917493410299904 |
---|---|
author | Meddahi, M Agapov, I Fuchsberger, K Goddard, B Herr, Werner Kain, V Mertens, V Missiaen, D Risselada, Thys Uythoven, J Wenninger, J Gianfelice, E |
author_facet | Meddahi, M Agapov, I Fuchsberger, K Goddard, B Herr, Werner Kain, V Mertens, V Missiaen, D Risselada, Thys Uythoven, J Wenninger, J Gianfelice, E |
author_sort | Meddahi, M |
collection | CERN |
description | Through May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was performed. For the first time, optics and dispersion measurements were also taken in the last part of the lines, and into the LHC. Extensive trajectory and optics studies were conducted, in parallel with hardware checks. In particular dispersion measurements and their comparison with the beam line model were analysed in detail and led to propose the addition of a dispersion-free steering algorithm in the existing trajectory correction program. Its effectiveness was simulated and is briefly discussed. |
id | cern-1199754 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-11997542019-09-30T06:29:59Zhttp://cds.cern.ch/record/1199754engMeddahi, MAgapov, IFuchsberger, KGoddard, BHerr, WernerKain, VMertens, VMissiaen, DRisselada, ThysUythoven, JWenninger, JGianfelice, EMachine studies during beam commissioning of the SPS-to-LHC transfer linesAccelerators and Storage RingsThrough May to September 2008, further beam commissioning of the SPS-to-LHC transfer lines was performed. For the first time, optics and dispersion measurements were also taken in the last part of the lines, and into the LHC. Extensive trajectory and optics studies were conducted, in parallel with hardware checks. In particular dispersion measurements and their comparison with the beam line model were analysed in detail and led to propose the addition of a dispersion-free steering algorithm in the existing trajectory correction program. Its effectiveness was simulated and is briefly discussed.CERN-ATS-2009-013oai:cds.cern.ch:11997542009-07-31 |
spellingShingle | Accelerators and Storage Rings Meddahi, M Agapov, I Fuchsberger, K Goddard, B Herr, Werner Kain, V Mertens, V Missiaen, D Risselada, Thys Uythoven, J Wenninger, J Gianfelice, E Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title | Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title_full | Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title_fullStr | Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title_full_unstemmed | Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title_short | Machine studies during beam commissioning of the SPS-to-LHC transfer lines |
title_sort | machine studies during beam commissioning of the sps-to-lhc transfer lines |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1199754 |
work_keys_str_mv | AT meddahim machinestudiesduringbeamcommissioningofthespstolhctransferlines AT agapovi machinestudiesduringbeamcommissioningofthespstolhctransferlines AT fuchsbergerk machinestudiesduringbeamcommissioningofthespstolhctransferlines AT goddardb machinestudiesduringbeamcommissioningofthespstolhctransferlines AT herrwerner machinestudiesduringbeamcommissioningofthespstolhctransferlines AT kainv machinestudiesduringbeamcommissioningofthespstolhctransferlines AT mertensv machinestudiesduringbeamcommissioningofthespstolhctransferlines AT missiaend machinestudiesduringbeamcommissioningofthespstolhctransferlines AT risseladathys machinestudiesduringbeamcommissioningofthespstolhctransferlines AT uythovenj machinestudiesduringbeamcommissioningofthespstolhctransferlines AT wenningerj machinestudiesduringbeamcommissioningofthespstolhctransferlines AT gianfelicee machinestudiesduringbeamcommissioningofthespstolhctransferlines |