Operational considerations for the PSB H- Injection System

For the LINAC4 project the PS Booster (PSB) injection system will be upgraded. The 160 MeV Hbeam will be distributed to the 4 superimposed PSB synchrotron rings and horizontally injected by means of an H- charge-exchange system. Operational considerations for the injection system are presented, incl...

Descripción completa

Detalles Bibliográficos
Autores principales: Weterings, W, Aiba, M, Borburgh, J, Carli, C, Fowler, T, Goddard, B
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1203023
_version_ 1780917795532308480
author Weterings, W
Aiba, M
Borburgh, J
Carli, C
Fowler, T
Goddard, B
author_facet Weterings, W
Aiba, M
Borburgh, J
Carli, C
Fowler, T
Goddard, B
author_sort Weterings, W
collection CERN
description For the LINAC4 project the PS Booster (PSB) injection system will be upgraded. The 160 MeV Hbeam will be distributed to the 4 superimposed PSB synchrotron rings and horizontally injected by means of an H- charge-exchange system. Operational considerations for the injection system are presented, including expected beam losses from unwanted field stripping of H- and excited H0 and foil scattering, possible injection failure cases and expected stripping foil lifetimes. Loading assumptions for the internal beam dumps are discussed together with estimates of doses on various components.
id cern-1203023
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12030232019-09-30T06:29:59Zhttp://cds.cern.ch/record/1203023engWeterings, WAiba, MBorburgh, JCarli, CFowler, TGoddard, BOperational considerations for the PSB H- Injection SystemAccelerators and Storage RingsFor the LINAC4 project the PS Booster (PSB) injection system will be upgraded. The 160 MeV Hbeam will be distributed to the 4 superimposed PSB synchrotron rings and horizontally injected by means of an H- charge-exchange system. Operational considerations for the injection system are presented, including expected beam losses from unwanted field stripping of H- and excited H0 and foil scattering, possible injection failure cases and expected stripping foil lifetimes. Loading assumptions for the internal beam dumps are discussed together with estimates of doses on various components.sLHC-PROJECT-Report-0006CERN-sLHC-PROJECT-Report-0006oai:cds.cern.ch:12030232009-06-12
spellingShingle Accelerators and Storage Rings
Weterings, W
Aiba, M
Borburgh, J
Carli, C
Fowler, T
Goddard, B
Operational considerations for the PSB H- Injection System
title Operational considerations for the PSB H- Injection System
title_full Operational considerations for the PSB H- Injection System
title_fullStr Operational considerations for the PSB H- Injection System
title_full_unstemmed Operational considerations for the PSB H- Injection System
title_short Operational considerations for the PSB H- Injection System
title_sort operational considerations for the psb h- injection system
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1203023
work_keys_str_mv AT weteringsw operationalconsiderationsforthepsbhinjectionsystem
AT aibam operationalconsiderationsforthepsbhinjectionsystem
AT borburghj operationalconsiderationsforthepsbhinjectionsystem
AT carlic operationalconsiderationsforthepsbhinjectionsystem
AT fowlert operationalconsiderationsforthepsbhinjectionsystem
AT goddardb operationalconsiderationsforthepsbhinjectionsystem