The 4 GeV H- Beam Transfer Line from the SPL to the PS2
The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed,...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1203201 |
_version_ | 1780917796622827520 |
---|---|
author | Hessler, C Eshraqi, M Goddard, B Lombardi, A M Meddahi, M |
author_facet | Hessler, C Eshraqi, M Goddard, B Lombardi, A M Meddahi, M |
author_sort | Hessler, C |
collection | CERN |
description | The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed, together with the magnet specifications. First considerations on longitudinal beam dynamics and on beam loss limitations from H- lifetime are presented. |
id | cern-1203201 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-12032012019-09-30T06:29:59Zhttp://cds.cern.ch/record/1203201engHessler, CEshraqi, MGoddard, BLombardi, A MMeddahi, MThe 4 GeV H- Beam Transfer Line from the SPL to the PS2Accelerators and Storage RingsThe proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed, together with the magnet specifications. First considerations on longitudinal beam dynamics and on beam loss limitations from H- lifetime are presented.sLHC-PROJECT-Report-0007CERN-sLHC-PROJECT-Report-0007oai:cds.cern.ch:12032012009-07-29 |
spellingShingle | Accelerators and Storage Rings Hessler, C Eshraqi, M Goddard, B Lombardi, A M Meddahi, M The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title | The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title_full | The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title_fullStr | The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title_full_unstemmed | The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title_short | The 4 GeV H- Beam Transfer Line from the SPL to the PS2 |
title_sort | 4 gev h- beam transfer line from the spl to the ps2 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1203201 |
work_keys_str_mv | AT hesslerc the4gevhbeamtransferlinefromthespltotheps2 AT eshraqim the4gevhbeamtransferlinefromthespltotheps2 AT goddardb the4gevhbeamtransferlinefromthespltotheps2 AT lombardiam the4gevhbeamtransferlinefromthespltotheps2 AT meddahim the4gevhbeamtransferlinefromthespltotheps2 AT hesslerc 4gevhbeamtransferlinefromthespltotheps2 AT eshraqim 4gevhbeamtransferlinefromthespltotheps2 AT goddardb 4gevhbeamtransferlinefromthespltotheps2 AT lombardiam 4gevhbeamtransferlinefromthespltotheps2 AT meddahim 4gevhbeamtransferlinefromthespltotheps2 |