The 4 GeV H- Beam Transfer Line from the SPL to the PS2

The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed,...

Descripción completa

Detalles Bibliográficos
Autores principales: Hessler, C, Eshraqi, M, Goddard, B, Lombardi, A M, Meddahi, M
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1203201
_version_ 1780917796622827520
author Hessler, C
Eshraqi, M
Goddard, B
Lombardi, A M
Meddahi, M
author_facet Hessler, C
Eshraqi, M
Goddard, B
Lombardi, A M
Meddahi, M
author_sort Hessler, C
collection CERN
description The proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed, together with the magnet specifications. First considerations on longitudinal beam dynamics and on beam loss limitations from H- lifetime are presented.
id cern-1203201
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12032012019-09-30T06:29:59Zhttp://cds.cern.ch/record/1203201engHessler, CEshraqi, MGoddard, BLombardi, A MMeddahi, MThe 4 GeV H- Beam Transfer Line from the SPL to the PS2Accelerators and Storage RingsThe proposed new CERN injector chain LINAC4, SPL, PS2 will require the construction of new beam transfer lines. A preliminary design has been performed for the 4 GeV SPL to PS2 H- transfer line. The constraints, beam parameters and geometry requirements are summarised and a possible layout proposed, together with the magnet specifications. First considerations on longitudinal beam dynamics and on beam loss limitations from H- lifetime are presented.sLHC-PROJECT-Report-0007CERN-sLHC-PROJECT-Report-0007oai:cds.cern.ch:12032012009-07-29
spellingShingle Accelerators and Storage Rings
Hessler, C
Eshraqi, M
Goddard, B
Lombardi, A M
Meddahi, M
The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title_full The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title_fullStr The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title_full_unstemmed The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title_short The 4 GeV H- Beam Transfer Line from the SPL to the PS2
title_sort 4 gev h- beam transfer line from the spl to the ps2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1203201
work_keys_str_mv AT hesslerc the4gevhbeamtransferlinefromthespltotheps2
AT eshraqim the4gevhbeamtransferlinefromthespltotheps2
AT goddardb the4gevhbeamtransferlinefromthespltotheps2
AT lombardiam the4gevhbeamtransferlinefromthespltotheps2
AT meddahim the4gevhbeamtransferlinefromthespltotheps2
AT hesslerc 4gevhbeamtransferlinefromthespltotheps2
AT eshraqim 4gevhbeamtransferlinefromthespltotheps2
AT goddardb 4gevhbeamtransferlinefromthespltotheps2
AT lombardiam 4gevhbeamtransferlinefromthespltotheps2
AT meddahim 4gevhbeamtransferlinefromthespltotheps2